Building consents

Building consents in Allenton

In Allenton itself, 22 new homes were consented in the same year. Below: 353 consents we hold in Allenton, searchable and on the map.

New homes in Allenton22+5% year to Sep 2026
Consents we hold35360 in the last 12 monthsSearch them ↓

New homes in Allenton

Stats NZ’s new dwellings for the 3 statistical areas that make up most of it: Allenton North, Allenton East, Allenton South. In the year to September 2026: 22 houses, 0 townhouses and units, 0 apartments.

02550751002010201220142016201820202022202420262010: 222011: 222012: 472013: 372014: 462015: 532016: 822017: 412018: 532019: 222020: 152021: 532022: 472023: 522024: 252025: 242026 (9 months): 17

Consents on record in Allenton

Individual building consents we hold, each on its property: 353 from 1 Jan 2012 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Fires and heating86

    18 in the last 12 months · typically $5,600

  2. New homes49

    17 in the last 12 months · typically $566k

  3. Alterations and additions45

    11 in the last 12 months · typically $45k

  4. Garages, sheds and carports33

    9 in the last 12 months · typically $45k

  5. Relocated buildings11

    typically $200k

  6. Plumbing, drainage and wastewater6

    1 in the last 12 months · typically $2,000

  7. Multiple homes5

    2 in the last 12 months · typically $1.1m

  8. Pools and spas5

    1 in the last 12 months · typically $95k

  9. Decks, pergolas and verandahs2

    typically $61k

  10. Repairs, recladding and strengthening2

    typically $25k

Consents on record by month

The last three years. A recent dip is often records still to arrive.

051015202420252026December 2023: 3January 2024: 2February 2024: 4March 2024: 3April 2024: 6May 2024: 2June 2024: 4July 2024: 6August 2024: 6September 2024: 5October 2024: 4November 2024: 4December 2024: 3January 2025: 1February 2025: 3March 2025: 3April 2025: 3May 2025: 5June 2025: 3July 2025: 5August 2025: 8September 2025: 9October 2025: 3November 2025: 5December 2025: 6January 2026: 2February 2026: 9March 2026: 9April 2026: 9May 2026: 12June 2026: 9July 2026: 2August 2026: 2September 2026: 0October 2026: 0November 2026: 0

Largest in the last 12 months

  1. $2.1mTwo storey dwg, block basement, 5 bedrooms, including lift 77 Belt Road
  2. $2.1mConstruction of new 5 bdrm res dwg with attached gge 117 Creek Road
  3. $1.8mSingle level dwg with sfh & attached gge
  4. $1.4mSingle level dwg with gas fire & attached gge 3 Douglas Drive
  5. $1.1mConstruction of 2 attached dwgs with attached garages & 2 detached dwgs with attached garages 208 Racecourse Road

353 consents

  1. Garages, sheds and carports$85k

    Pole shed with toilet facilities

    19 Meadowlands Green · 1 Aug 2026 · BC0367/26

  2. New homes$2.1m

    Construction of new 5 bdrm res dwg with attached gge

    117 Creek Road · 1 Aug 2026 · BC260195

  3. Garages, sheds and carports$112k

    Steel framed shed

    8 Cavendish Street · 1 Jul 2026 · BC0353/26

  4. Fires and heating$120k

    Install f/s rika filo pellet fire

    4 Tranquil Place · 1 Jul 2026 · BC0409/26

  5. Plumbing, drainage and wastewater$3,000

    Existing plumbing to be plumbed to the sink, hair wash basin housing - detached

    23 Harrison Street · 1 Jun 2026 · 26/1076

  6. New homes$370k

    Single level dwg & attached gge

    · 1 Jun 2026 · BC0303/26

  7. New homes$354k

    Single level dwg & attached gge

    · 1 Jun 2026 · BC0308/26

  8. Fires and heating$2,000

    Install a f/s metro xtreme rad base sfh

    129 Harrison Street · 1 Jun 2026 · BC0312/26

  9. Fires and heating$2,100

    F/s masport Hurunui on legs sfh

    93 Creek Road · 1 Jun 2026 · BC0319/26

  10. Fires and heating$5,000

    Install a f/s masport, Kaituna ash sfh

    101 Middle Road · 1 Jun 2026 · BC0329/26

  11. Fires and heating$6,000

    Install a f/s woodsman kanaku sfh

    1 McNicol Crescent · 1 Jun 2026 · BC0338/26

  12. New homes$305k

    Single level dwg & attached gge

    10 Bullock Street · 1 Jun 2026 · BC0547/25

  13. Fires and heating$5,000

    Remove old woodfire & replace with new fire & flue

    2 Hanrahan Street · 1 Jun 2026 · BC260547

  14. Garages, sheds and carports$120k

    Convert existing gge into a 2 bdrm minor res detached dwgs

    32 Farm Road · 1 May 2026 · 25/0669

  15. New homes$700k

    Single level detached dwg

    139 Middle Road · 1 May 2026 · ABA20260307

  16. Alterations and additions$8,500

    Install firenzo contessa ag on leg base & tiled wall ash floor protector 1060x1060mm

    84 Middle Road · 1 May 2026 · ABA20260441

  17. New homes$700k

    Single level dwg with attached gge

    21 Meadowlands Green · 1 May 2026 · BC0122/26

  18. New homes$1.4m

    Single level dwg with gas fire & attached gge

    3 Douglas Drive · 1 May 2026 · BC0164/26

  19. Garages, sheds and carports$48k

    Pole shed

    83 Hepburns Road · 1 May 2026 · BC0244/26

  20. Fires and heating$3,500

    Install a f/s woodsman coleridge sfh

    22 Glassey Drive · 1 May 2026 · BC0254/26

  21. Alterations and additions$100k

    Internal alterations

    17 Elizabeth Place · 1 May 2026 · BC0267/26

  22. Fires and heating$6,500

    F/s metro ultra wee rad sfh

    98 Allens Road · 1 May 2026 · BC0273/26

  23. New homes$2.1m

    Two storey dwg, block basement, 5 bedrooms, including lift

    77 Belt Road · 1 May 2026 · BC260189

  24. Fires and heating$6,000

    Install f/s masport Wanaka solid fuel burner (replacement)

    83 Racecourse Road · 1 May 2026 · BDG/2026/254

  25. Insulation$5,000

    Install Insulmax Insulation to exterior walls as per CodeMark Certificate CMNZ70028

    25 Windsor Street · 1 May 2026 · BLD.2026-10029

ResidentialCommercial The dots are this page of the list.

Near Allenton

Questions

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.