Building consents · Stats NZ figures to September 2026
Building consents in Karekare
17,131 new homes were consented in the Auckland council area in the year to September 2026, up 16% on the year before. They also consented $3.37b of non-residential building work, up 5% on the year before. In the statistical area around Karekare, 1 new homes were consented in the same year. Below: 25 consents we hold in Karekare, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Auckland council area, and new homes down to statistical areas, which is how Karekare’s own count is made.
New homes consented each month
Dwellings in new building consents, Auckland, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 21,301 in 2022.
New homes in Karekare
Stats NZ’s new dwellings for the statistical area Karekare sits in (Waitākere Ranges South) — the suburb is smaller than one. In the year to September 2026: 0 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Auckland, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$753m
43 buildings · 26,927 m² new floor area · $8,567/m² new · −24% on the year before
- Warehouses and storage$631m
84 buildings · 233,139 m² new floor area · $2,450/m² new · +9% on the year before
- Education$590m
77 buildings · 54,555 m² new floor area · $8,792/m² new · +4% on the year before
- Factories and industrial$402m
44 buildings · 21,405 m² new floor area · $14,113/m² new · −5% on the year before
- Shops, restaurants and bars$307m
32 buildings · 40,270 m² new floor area · $4,291/m² new · +19% on the year before
- Hospitals and health$219m
29 buildings · 19,980 m² new floor area · $6,216/m² new · +41% on the year before
- Hostels, boarding houses and prisons$197m
11 buildings · 25,285 m² new floor area · $7,276/m² new · +218% on the year before
- Social, cultural and religious$167m
29 buildings · 11,019 m² new floor area · $3,823/m² new · +62% on the year before
- Hotels and motels$75.4m
17 buildings · 13,619 m² new floor area · $3,956/m² new · +37% on the year before
- Farm buildings$26.2m
121 buildings · 68,341 m² new floor area · $353/m² new · +4% on the year before
Consents on record in Karekare
Individual building consents we hold, each on its property: 25 from 1 Dec 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes5
1 in the last 12 months · typically $180k
- Fires and heating4
typically $4,940
- Alterations and additions2
1 in the last 12 months · typically $25k
- Minor dwellings and sleepouts2
1 in the last 12 months · typically $320k
- Retaining walls1
1 in the last 12 months · typically $300k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $25k
- Demolition1
typically $420k
- Repairs, recladding and strengthening1
typically $250k
- Decks, pergolas and verandahs1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $300kNew retaining wall. 1 Watchmans Road
- $140kAmendment to building consent no: bco10404205 - rbw - previously consented minor unit design has been updated on new eng foundations, steel portal & roof members. Ww system has also been updated - r 134 Lone Kauri Road
- $125kRbw - proposed minor dwg with timber decks on engineered subfloor, colorsteel roofing, pine weatherboards cladding over rab, timber joinery, engineered retaining wall, cantilevered members, glass 134 Lone Kauri Road
- $25kInstallation of a hynds lifestyle advanced on-site wastewater treatment plant with treated effluent discharged to land via pressure-compensating dripper irrigation (pcdi) for a future two-bdrm dwel 105 Lone Kauri Road
- $19kRbw - add & alt - internal reconfiguration of a bathrm, add of ensuite. Modification to the existing stairwell. 10 La Trobe Track
25 consents
- Retaining walls$300k
New retaining wall.
- Alterations and additions$19k
Rbw - add & alt - internal reconfiguration of a bathrm, add of ensuite. Modification to the existing stairwell.
- Plumbing, drainage and wastewater$25k
Installation of a hynds lifestyle advanced on-site wastewater treatment plant with treated effluent discharged to land via pressure-compensating dripper irrigation (pcdi) for a future two-bdrm dwel
- Minor dwellings and sleepouts$140k
Amendment to building consent no: bco10404205 - rbw - previously consented minor unit design has been updated on new eng foundations, steel portal & roof members. Ww system has also been updated - r
- New homes$125k
Rbw - proposed minor dwg with timber decks on engineered subfloor, colorsteel roofing, pine weatherboards cladding over rab, timber joinery, engineered retaining wall, cantilevered members, glass
- New homes$150k
Rbw- a new single level timber framed weatherboard minor dwg with 1bdrm, bathrm, living & kitchen area. Effluent disposal system upgrade for main dwg & proposed minor dwg unit
- Demolition$420k
Rbw - 48m2 additions to existing dwg with two-bedrooms, bathrm & two-stairs. 48m2 demolish existing bdrm wing. Four-bedrooms, bathrm & stairs.
- Minor dwellings and sleepouts$500k
rbw new gge with laundry studio space above
- New homes$430k
dbc rbw new minor dwg, gge & decking.
- New homes$180k
New minor dwg of 36m2 detached dwgs
- Fires and heating$7,800
Installation of solid wood burner (yunca monte euro).
- Alterations and additions$30k
Rbw - bathrm, wc, laundry & study to be replaced with expanded bathrm & laundry areas, some new window joinery to be replace & install two skylights.
- Repairs, recladding and strengthening$250k
Rbw - recladding of existing dwg
- New homes$490k
Dbc -rbw - new two-storey dwg with three bedrooms, bathrm, guest toilet, kitchen & wood burner. New landscape retaining wall, new in-ground retaining wall, new parking bunker for vehicle turning. New waste-water treatment plant & water ta
- Fires and heating$4,990
installation of solid wood burner (firenzo contessa)
- Fires and heating$4,530
installation of solid wood burner (firenzo contessa)
- Decks, pergolas and verandahs$200k
Reclad the existing dwg & rebuild deck detached dwg
- Fires and heating$4,889
install new metro free standing fire with new flue
- Fires and heating$4,992
Installation of bosca firepoint 360 solid wood burner.
- Fires and heating$95k
rbw: add to existing dwg. Adding lounge & fireplace
- Fires and heating$4,890
Installation of solid wood burner. (jayline fr300)
- Fires and heating$4,729
remove existing fire & flue. Install new free standing metro fire & new flue.
- New homes$600k
2 bdrm dwg with different cladding types & to be 2 res dwg, ...
- Fires and heating$4,999
new free standing masport r3000ws solid wood burner as per manufacturer specification.
- Garages, sheds and carports$100k
New gge gge
ResidentialCommercial The dots are this page of the list.
Near Karekare
Questions
How many building consents were issued in Karekare?
In the year to September 2026, Stats NZ counted 17,131 new homes consented in the Auckland council area, with $8.53b of residential and $3.37b of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.