Building consents · Stats NZ figures to September 2026
Commercial building consents in Mount Albert
Councils consented $3.37b of non-residential building work in the Auckland council area in the year to September 2026, up 5% on the year before. Below: 12 commercial consents we hold in Mount Albert, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Auckland council area.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Auckland, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$753m
43 buildings · 26,927 m² new floor area · $8,567/m² new · −24% on the year before
- Warehouses and storage$631m
84 buildings · 233,139 m² new floor area · $2,450/m² new · +9% on the year before
- Education$590m
77 buildings · 54,555 m² new floor area · $8,792/m² new · +4% on the year before
- Factories and industrial$402m
44 buildings · 21,405 m² new floor area · $14,113/m² new · −5% on the year before
- Shops, restaurants and bars$307m
32 buildings · 40,270 m² new floor area · $4,291/m² new · +19% on the year before
- Hospitals and health$219m
29 buildings · 19,980 m² new floor area · $6,216/m² new · +41% on the year before
- Hostels, boarding houses and prisons$197m
11 buildings · 25,285 m² new floor area · $7,276/m² new · +218% on the year before
- Social, cultural and religious$167m
29 buildings · 11,019 m² new floor area · $3,823/m² new · +62% on the year before
- Hotels and motels$75.4m
17 buildings · 13,619 m² new floor area · $3,956/m² new · +37% on the year before
- Farm buildings$26.2m
121 buildings · 68,341 m² new floor area · $353/m² new · +4% on the year before
Non-residential work since 1991
The value consented each year, in the dollars of the day (not adjusted for inflation).
Commercial consents on record in Mount Albert
Individual building consents we hold, each on its property: 12 from 1 Sep 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations5
typically $75k
- New commercial buildings3
1 in the last 12 months · typically $1m
- Fit-outs2
1 in the last 12 months · typically $1.3m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.5mRbw - construction of a new single storey dwg compromising of 4 bedrooms, 3 bathrooms, media room, office space, dbl internal gge. Includes proposal of new stormwater borehole, swimming poo 15 Stilwell Road
- $120kRbw - add/alt - alterations to an existing two unit two-level res building to create four self-contained res units. The works include the construction of new inter-tenancy 2/122 Richardson Road
12 consents
- Fit-outs$120k
Rbw - add/alt - alterations to an existing two unit two-level res building to create four self-contained res units. The works include the construction of new inter-tenancy
- New commercial buildings$2.5m
Rbw - construction of a new single storey dwg compromising of 4 bedrooms, 3 bathrooms, media room, office space, dbl internal gge. Includes proposal of new stormwater borehole, swimming poo
- New commercial buildings$1m
Stage 1 of 2 - construction of new dwg in place of the previous one. Five bedrooms, plus an office, with two lounges, three bathrooms, & a wc. Includes dbl gge & laundry, plus stormwate
- Commercial alterations$80k
Rbw - converting the existing gge into a workshop. Removing the existing mezzanine floor, ladder, installing a new mezzanine floor, balustrade & attic ladder. New window joinery. New internal acc
- Commercial alterations$75k
Rbw - add/alt - bdrm converted to office/bar with a new cavity slider door on the wall facing the entry hall & another on the wall facing the lounge. Incorporation of a bar. New door
- Commercial alterations$60k
Rbw - removal of internal walls. Relocation of laundry to new scullery. New dbl glazed timber window joinery to office. New dbl glazed timber bi-fold joinery to kitchen.
- Commercial alterations$50k
Rbw - 5.47 m2 add to existing home office & renovations to existing house.
- New commercial buildings$900k
Rbw - new 2 storey house on split floor level with 5 bedrooms, 1 office, 4.5 bathrooms, dbl gge & swimming pool
- Fit-outs$2.4m
Rbw - 6x3 storey res terrace houses. Timber framed with concrete slab foundation. Gib inter-tenancy wall. Aluminium window & door. Cladding: vertical linea oblique weatherboard & timber bevel back weatherboard. Roofing: metalcraft t-rib ste
- Commercial alterations$350k
new upper level dormers added to allow upper level lounge, bdrm, bathrm, office. Form new parking in front yard. Rebuild top deck on existing gge.
- Commercial alterations$200k
rbw - new gge & office add with alterations & additions to lounge including powder room plus new decks to rear yard.
- Commercial alterations$6,000
rbw - push out the sleepout & office wall 500mm to west boundary.
ResidentialCommercial The dots are this page of the list.
Near Mount Albert
Questions
How many building consents were issued in Mount Albert?
In the year to September 2026, Stats NZ counted 17,131 new homes consented in the Auckland council area, with $8.53b of residential and $3.37b of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.