Building consents · Stats NZ figures to September 2026
Building consents in Westwood
501 new homes were consented in the Dunedin City council area in the year to September 2026, up 7% on the year before. They also consented $135m of non-residential building work, down 49% on the year before. In the statistical area around Westwood, 11 new homes were consented in the same year. Below: 17 consents we hold in Westwood, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Dunedin City council area, and new homes down to statistical areas, which is how Westwood’s own count is made.
New homes consented each month
Dwellings in new building consents, Dunedin City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 548 in 2021.
New homes in Westwood
Stats NZ’s new dwellings for the statistical area Westwood sits in (Brighton) — the suburb is smaller than one. In the year to September 2026: 8 houses, 3 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Dunedin City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$36.8m
4 buildings · 2,575 m² new floor area · $11,379/m² new · −79% on the year before
- Education$26.7m
5 buildings · 1,648 m² new floor area · $4,333/m² new · −10% on the year before
- Offices$19m
3 buildings · 994 m² new floor area · $4,863/m² new · +47% on the year before
- Factories and industrial$17.2m
6 buildings · 3,608 m² new floor area · $3,160/m² new · +41% on the year before
- Hostels, boarding houses and prisons$12.8m
1 building · 504 m² new floor area · $655/m² new · +551% on the year before
- Shops, restaurants and bars$9.4m
2 buildings · 1,169 m² new floor area · $2,737/m² new · +12% on the year before
- Social, cultural and religious$6.5m
3 buildings · 1,404 m² new floor area · $605/m² new · −56% on the year before
- Farm buildings$2.5m
24 buildings · 4,194 m² new floor area · $556/m² new · −9% on the year before
- Warehouses and storage$2.4m
2 buildings · 1,758 m² new floor area · $813/m² new · −35% on the year before
- Hotels and motels$1.9m
−35% on the year before
Consents on record in Westwood
Individual building consents we hold, each on its property: 17 from 1 Sep 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
3 in the last 12 months · typically $1,000
- New homes2
1 in the last 12 months · typically $787k
- Fires and heating2
typically $6,000
- Multiple homes1
1 in the last 12 months · typically $1.2m
- Plumbing, drainage and wastewater1
typically $18k
- Relocated buildings1
typically $100k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mErect 2 detached dwgs (one with attached gge) & shed, install lift in dwg 463 Brighton Road
- $900kErect two storey dwg with attached gge, install access elevators magic carpet lift & water tank 601 Brighton Road
- $60kExtend & alt internal layout of dwg 607 Brighton Road
- $1,000Amendment to aba-2025-1705 - alt precast panels, lift shaft, insulation, window joinery, laundry layout, drainage & water tank 601 Brighton Road
- $1Amendment to aba-2025-1705 - alt layout of laundry & storage rooms, alt roof to form internal gutters & drainage 601 Brighton Road
17 consents
- Alterations and additions$1
Amendment to aba-2025-1705 - alt layout of laundry & storage rooms, alt roof to form internal gutters & drainage
- Alterations and additions$60k
Extend & alt internal layout of dwg
- Alterations and additions$1,000
Amendment to aba-2025-1705 - alt precast panels, lift shaft, insulation, window joinery, laundry layout, drainage & water tank
- Multiple homes$1.2m
Erect 2 detached dwgs (one with attached gge) & shed, install lift in dwg
- New homes$900k
Erect two storey dwg with attached gge, install access elevators magic carpet lift & water tank
- Relocated buildings$100k
Relocate dwg (construct foundations & connect to site services) & erect deck with access stair
- Alterations and additions$1,000
Amendment to aba-2021-2516 - change dimensions & location of wd.22 & revise bracing
- Fires and heating$7,000
Install champion ena pellet fire in dwg
- Fires and heating$5,000
Install jayline ss200l heater in dwg
- Plumbing, drainage and wastewater$18k
Alt internal layout of bathrm, toilet & laundry, construct wardrobe in bdrm 1 & 3 & cupboard in hallway
- New homes$674k
Erect Two Storey Dwelling with Attached Garage, Install Freestanding Masport Akaroa Heater
- Fires and heating$3,000
Install kent Oxford heater in dwg
- Demolition$70k
Demolish gge, extend dwg to form bdrm & ensuite
- New homes$430k
Erect Dwelling with Attached Garage, Install Freestanding Yunca Monte Heater, Soak Pit
- Fires and heating$6,000
Install masport Rangitata heater in dwg
- Plumbing, drainage and wastewater$10k
Infill door/create laundry, install laundry tub/toilet in dwg
- Decks, pergolas and verandahs$180k
Extend dwg for kitchen/dining, entry porch & deck with verandah, alt internal layout, install nectre n65c heater, erect retaining walls & detached workshop
ResidentialCommercial The dots are this page of the list.
Near Westwood
Questions
How many building consents were issued in Westwood?
In the year to September 2026, Stats NZ counted 501 new homes consented in the Dunedin City council area, with $256m of residential and $135m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.