Building consents · Stats NZ figures to September 2026
Building consents in Kumara
49 new homes were consented in the Grey District council area in the year to September 2026, down 35% on the year before. They also consented $12.7m of non-residential building work, down 56% on the year before. In the statistical area around Kumara, 27 new homes were consented in the same year. Below: 16 consents we hold in Kumara, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Grey District council area, and new homes down to statistical areas, which is how Kumara’s own count is made.
New homes consented each month
Dwellings in new building consents, Grey District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 107 in 2007.
New homes in Kumara
Stats NZ’s new dwellings for the statistical area Kumara sits in (Arahura-Kūmara) — the suburb is smaller than one. In the year to September 2026: 25 houses, 2 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Grey District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$4m
−27% on the year before
- Farm buildings$3.6m
21 buildings · 6,386 m² new floor area · $566/m² new · +87% on the year before
- Warehouses and storage$2.1m
2 buildings · 1,191 m² new floor area · $1,738/m² new · −41% on the year before
- Education$1.5m
1 building · 184 m² new floor area · $5,163/m² new · +139% on the year before
- Factories and industrial$979k
3 buildings · 801 m² new floor area · $1,186/m² new · −15% on the year before
- Social, cultural and religious$280k
1 building · 47 m² new floor area · $1,702/m² new · −98% on the year before
- Hotels and motels$180k
1 building · 126 m² new floor area · $952/m² new · −49% on the year before
- Shops, restaurants and bars$67k
−93% on the year before
Consents on record in Kumara
Individual building consents we hold, each on its property: 16 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
1 in the last 12 months · typically $4,000
- Plumbing, drainage and wastewater2
typically $28k
- Multiple homes2
typically $715k
- New homes2
typically $537k
- Alterations and additions1
1 in the last 12 months · typically $30k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $30kInternal alt & refurbishment of the existing bathrm & laundry in a stand-alone res dwg. 129 Seddon Street
- $5,000Installation of a woodsman rmf freestanding multifuel heating appliance 80 Greenstone Road
16 consents
- Fires and heating$5,000
Installation of a woodsman rmf freestanding multifuel heating appliance
- Alterations and additions$30k
Internal alt & refurbishment of the existing bathrm & laundry in a stand-alone res dwg.
- Plumbing, drainage and wastewater$25k
Installation of new 5700ltr devan septic tank with outlet filter & soak hole system to replace existing.
- Plumbing, drainage and wastewater$30k
Foundations & drainage for a newly prefabricated cottage to be installed on site.
- New homes$483k
Construction of single storey dwg 2 bedrooms, 2 bathrooms
- Fires and heating$3,000
Woodsman uleb freestanding log burner 61 Seddon St Rangiora lot 48 dp 29429
- Multiple homes$590k
Rbw - housing (multi-unit dwg) - new 2 x two storey, 2 bdrm dwgs as a duplex, stormwater detention & a sewage pumping station (lots 6 & 7)
- New homes$590k
Rbw - housing (multi-unit dwg) - new 2-storey 2-unit dwg on concrete raft slab, timber deck, stormwater detention & sewage pumping station (lots 8 & 9)
- Multiple homes$840k
RBW - housing (multi-unit dwg) - new 2 x two storey, 3 bdrm dwgs as a duplex, a timber deck, stormwater detention & a sewage pumping station (lot 10 & 11)
- Fires and heating$4,000
Install coaster space heater & wetback
- Garages, sheds and carports$39k
Gge extension.
- Alterations and additions$6,000
Installation of a stag wet multifuel wet fire
- Minor dwellings and sleepouts$1
Construct yoga studio amendment 1: building shape changed from octagon to rectangle. Floor & sub-floor changed from plywood on pile structure to concrete slab on ground. Roof changed from hip to gable. Cladding changed from ply & batten to vertic
- Minor dwellings and sleepouts$90k
Construct yoga studio
- Pools and spas$40k
Re-pile & raising dwg approx 250-300mm to provide sufficient crawl space. Amendment 1: install new fire, add extra doors windows, remove internal walls & install supporting roof beams & reline interior to achieve current bracing requiremen
- Fires and heating$6,000
Remove existing fireplace & replace with woodsman coaster with wetback
ResidentialCommercial The dots are this page of the list.
Near Kumara
Questions
How many building consents were issued in Kumara?
In the year to September 2026, Stats NZ counted 49 new homes consented in the Grey District council area, with $34.2m of residential and $12.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.