Below: 1,207 consents we hold in Haruru, searchable and on the map.
Consents on record in Haruru
Individual building consents we hold, each on its property: 1,207 from 8 Nov 1991 to 3 Nov 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions36
6 in the last 12 months · typically $50k
- Garages, sheds and carports33
1 in the last 12 months · typically $41k
- Fires and heating32
5 in the last 12 months · typically $3,000
- Relocated buildings12
5 in the last 12 months · typically $50k
- New homes9
2 in the last 12 months · typically $465k
- Plumbing, drainage and wastewater8
4 in the last 12 months · typically $20k
- Retaining walls6
2 in the last 12 months · typically $40k
- Decks, pergolas and verandahs4
1 in the last 12 months
- Pools and spas4
- New commercial buildings2
2 in the last 12 months
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $250kProposed lot 19 - foundations for relocated dwelling 2B Ash Grove Circle, Haruru
- $250kConstruct new minor dwg on est 19 Haruru Falls Road, Haruru
- $250kLot 18 new two-bdrm dwg inc 2B Ash Grove Circle, Haruru
- $50kProposed lot 3 - foundations for re 2B Ash Grove Circle, Haruru
- $50kProposed lot 2 - foundations for relocated dwg 2B Ash Grove Circle, Haruru
1,207 consents
- Plumbing, drainage and wastewater
Amendment relates to E1 site works and drainage
- New commercial buildings
Erect a cold rolled steel portal frame building as a garage/workshop.
- Plumbing, drainage and wastewater
Dwelling with SED pole foundations. Wastewater to Council network.
- Relocated buildings
Foundations, retaining wall and service connections for a relocated dwelling.
- Decks, pergolas and verandahs
New waterproofing to existing concrete upper floor deck, new timber upper floor deck extension. Removal and replacement of cladding on North East wall’
- Retaining walls
Replacement of existing retaining wall
- Fires and heating$8,500
Installation of a woodsman fire &
- Alterations and additions$7,000
Install of a wagener flair clean ai
- Alterations and additions
Transport 2x ex-Whangarei Health Board homes to site and relocate to the campground area for Visitor Accommodation
- Other new buildings
New ceiling support layout & fixing details to top plate
- Fires and heating$6,900
Install of a metro Ltd wee rad base
- Plumbing, drainage and wastewater$20k
New secondary wastewater treatment
- Garages, sheds and carports
Totalspan propose to build a Gable Range Garage.
- Fires and heating$8,000
Install of a fire metro wee rad bas
- Minor dwellings and sleepouts
PIM ONLY: build a granny flat, connect to existing stormwater & wastewater services
- Fires and heating$7,000
Install of a metro wee rad woody wo
- Relocated buildings
Relocation of Existing Dwelling onto timber piles, drainage and adding a toilet to the bathroom and vanity to the laundry/bathroom
- Plumbing, drainage and wastewater
Attach to mains sewer and connect a macerator & pipework.
- Fires and heating$7,500
Install of a metro wee rad woody fr
- New commercial buildings
Construction of new offices to existing infrastructure as noted on EBC-2025-782/0
- New homes$250k
Construct new minor dwg on est
- Alterations and additions$50k
Proposed lot 3 - foundations for re
- Alterations and additions
Updating H1 & smoke alarms to comply with new rules.
- Relocated buildings$50k
Proposed lot 2 - foundations for relocated dwg
- Alterations and additions
Proposed 12m x 12m gable roofed steel canopy structure with associated
ResidentialCommercial The dots are this page of the list.
Suburbs in Haruru
Where the consents we hold are, most in the last 12 months first.
Questions
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.