Building consents · Stats NZ figures to September 2026
Building consents in Woodend
229 new homes were consented in the Invercargill City council area in the year to September 2026, up 21% on the year before. They also consented $44m of non-residential building work, down 65% on the year before. In the statistical area around Woodend, 2 new homes were consented in the same year. Below: 13 consents we hold in Woodend, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Invercargill City council area, and new homes down to statistical areas, which is how Woodend’s own count is made.
New homes consented each month
Dwellings in new building consents, Invercargill City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 286 in 2021.
New homes in Woodend
Stats NZ’s new dwellings for the statistical area Woodend sits in (Woodend-Greenhills) — the suburb is smaller than one. In the year to September 2026: 2 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Invercargill City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$13.2m
3 buildings · 677 m² new floor area · $3,676/m² new · +30% on the year before
- Education$8.3m
4 buildings · 410 m² new floor area · $2,812/m² new · −64% on the year before
- Factories and industrial$7m
3 buildings · 6,110 m² new floor area · $552/m² new · −62% on the year before
- Shops, restaurants and bars$5.4m
2 buildings · 858 m² new floor area · $3,613/m² new · −24% on the year before
- Farm buildings$3.6m
36 buildings · 8,469 m² new floor area · $416/m² new · −18% on the year before
- Hostels, boarding houses and prisons$2.9m
1 building · 484 m² new floor area · $5,165/m² new · +1064% on the year before
- Social, cultural and religious$2.8m
1 building · 65 m² new floor area · $462/m² new · −94% on the year before
- Hospitals and health$650k
+4% on the year before
- Warehouses and storage$216k
2 buildings · 264 m² new floor area · $720/m² new · −98% on the year before
Consents on record in Woodend
Individual building consents we hold, each on its property: 13 from 1 Feb 2020 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $155k
- Fires and heating3
typically $6,500
- Garages, sheds and carports2
typically $24k
- New homes1
1 in the last 12 months · typically $1.2m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mNew three bdrm dwg with attached gge 24 Blyth Street
13 consents
- New homes$1.2m
New three bdrm dwg with attached gge
- Garages, sheds and carports$18k
Extension to shed to include 3 bay shed
- Garages, sheds and carports$30k
New shed & carport outbuildings
- Fires and heating$1
Amend 2022/1346 add of second hand fisher-denniston solid fuel burner
- Fires and heating$7,000
Install yunca monte multi-fuel
- Alterations and additions$300k
Rbw alterations to include bathrooms, interior walls removed & portion of exterior walls removed
- Alterations and additions$6,000
Install f/standing jayline fr300
- Fires and heating$6,500
Rbw install yunca monte multi fuel burner, alt to gge wall
- Alterations and additions$155k
Rbw extend dwg, renovate interior, new roof structure & cladding, install yunca monte multi fuel burner
- Insulation$1
Schedule 1 exemption (2) - installation of insulmax blown mineral fiber insulation to the exterior walls of the property.
- Insulation$1
Schedule 1 exemption (2) - installation of insulmax blown mineral fiber insulation to the exterior walls of the property. Details of install itemised in attached existing building assessment
- Garages, sheds and carports$22k
New versatile gge, accessory buildings
- Plumbing, drainage and wastewater$19k
Replace septic tank & new effluent field, plumbing & drainage works
ResidentialCommercial The dots are this page of the list.
Near Woodend
Questions
How many building consents were issued in Woodend?
In the year to September 2026, Stats NZ counted 229 new homes consented in the Invercargill City council area, with $120m of residential and $44m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.