Building consents · Stats NZ figures to September 2026
Building consents in Maromaku
314 new homes were consented in the Far North District council area in the year to September 2026, up 38% on the year before. They also consented $60.7m of non-residential building work, about level with the year before. In the statistical area around Maromaku, 2 new homes were consented in the same year. Below: 62 consents we hold in Maromaku, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area, and new homes down to statistical areas, which is how Maromaku’s own count is made.
New homes consented each month
Dwellings in new building consents, Far North District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 541 in 2004.
New homes in Maromaku
Stats NZ’s new dwellings for the statistical area Maromaku sits in (Maromaku) — the suburb is smaller than one. In the year to September 2026: 1 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Far North District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Education$11.9m
3 buildings · 471 m² new floor area · $4,246/m² new · −13% on the year before
- Hospitals and health$10.7m
4 buildings · 1,584 m² new floor area · $4,962/m² new · +25% on the year before
- Social, cultural and religious$9m
7 buildings · 1,458 m² new floor area · $3,575/m² new · −28% on the year before
- Factories and industrial$7m
8 buildings · 3,705 m² new floor area · $1,421/m² new · −31% on the year before
- Hotels and motels$5.4m
2 buildings · 674 m² new floor area · $6,306/m² new · +1368% on the year before
- Offices$5m
2 buildings · 1,427 m² new floor area · $1,367/m² new · +111% on the year before
- Farm buildings$4.6m
31 buildings · 6,328 m² new floor area · $645/m² new · +40% on the year before
- Warehouses and storage$4.2m
6 buildings · 2,980 m² new floor area · $1,418/m² new · +227% on the year before
- Shops, restaurants and bars$2.9m
1 building · 126 m² new floor area · $2,778/m² new · −65% on the year before
Consents on record in Maromaku
Individual building consents we hold, each on its property: 62 from 12 Oct 1993 to 6 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
- Plumbing, drainage and wastewater1
typically $25k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
62 consents
- Plumbing, drainage and wastewater$25k
Install new onsite wastewater & s
- Fires and heating
Install of a Metro Xtreme Rad Woody Fire, Flue, Pan Flashing and Drop Box
- Fires and heating
Install Jayline FR400 Wood Burner Free-Standing
- Fires and heating
Installation of Metro Xtreme Rad F/S woodburner and standard flue kit
- Fires and heating
Internal Alterations to Existing Dwelling Install a Yunca Xander Inbuilt Fire Place, New Decks and Extend Roof Over Deck
- Relocated buildings
Foundations for Relocated Dwelling and Decks
- Alterations and additions
Detached Dwelling
- Other new buildings
Construct a 3 Metre High Chain Link Fence
- Repairs, recladding and strengthening
Seismic Strengthening to Existing Church/Meeting House
- Plumbing, drainage and wastewater
Replace Failed On-Site Wastewater Disposal System and Drains to House
- Fires and heating
Install a New Metro Xtreme Rad Wood Burner and Flue System
- Farm buildings
Construct New Dairy Shed and Feedpad
- Fires and heating
Install a Warmington Cardrona Cooker Freestanding Woodburner and SFP Flue System
- Fires and heating
Installation of a Metro LTD Xtreme Rad Fire and Flue Kit
- Fires and heating
Installation of Kent Fireplace
- Relocated buildings
Foundations for a Relocatable 3 Bedroom Dwelling
- Plumbing, drainage and wastewater
Decommission and replace Onsite Effluent System
- Fires and heating
Install Pyroclassic Model IV Freestanding Wood Burner and Flue Kit
- Alterations and additions
Proposed Alterations Cancelled
- Alterations and additions
Change to Foundations
- Decks, pergolas and verandahs
Piles and Deck Layout
- New homes
New Dwelling ( Change to Bracing for Garage plus New Fireplace )
- New homes
New Transportable Sunshine Home
- Relocated buildings
Foundations for Relocated Dwelling plus Additions, Alterations and Effluent Disposal System
- Other new buildings
New 441 m2 Cowshed Building
ResidentialCommercial The dots are this page of the list.
Near Maromaku
Questions
How many building consents were issued in Maromaku?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.