Building consents · Stats NZ figures to September 2026
Building consents in Te Ti Mangonui
314 new homes were consented in the Far North District council area in the year to September 2026, up 38% on the year before. They also consented $60.7m of non-residential building work, about level with the year before. In Te Ti Mangonui itself, 7 new homes were consented in the same year. Below: 332 consents we hold in Te Ti Mangonui, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area, and new homes down to statistical areas, which is how Te Ti Mangonui’s own count is made.
New homes consented each month
Dwellings in new building consents, Far North District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 541 in 2004.
New homes in Te Ti Mangonui
Stats NZ’s new dwellings for the statistical area that make up most of it: Rangitane-Purerua. In the year to September 2026: 7 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Far North District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Education$11.9m
3 buildings · 471 m² new floor area · $4,246/m² new · −13% on the year before
- Hospitals and health$10.7m
4 buildings · 1,584 m² new floor area · $4,962/m² new · +25% on the year before
- Social, cultural and religious$9m
7 buildings · 1,458 m² new floor area · $3,575/m² new · −28% on the year before
- Factories and industrial$7m
8 buildings · 3,705 m² new floor area · $1,421/m² new · −31% on the year before
- Hotels and motels$5.4m
2 buildings · 674 m² new floor area · $6,306/m² new · +1368% on the year before
- Offices$5m
2 buildings · 1,427 m² new floor area · $1,367/m² new · +111% on the year before
- Farm buildings$4.6m
31 buildings · 6,328 m² new floor area · $645/m² new · +40% on the year before
- Warehouses and storage$4.2m
6 buildings · 2,980 m² new floor area · $1,418/m² new · +227% on the year before
- Shops, restaurants and bars$2.9m
1 building · 126 m² new floor area · $2,778/m² new · −65% on the year before
Consents on record in Te Ti Mangonui
Individual building consents we hold, each on its property: 332 from 17 Jun 1994 to 16 Oct 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions10
3 in the last 12 months · typically $78k
- Pools and spas4
1 in the last 12 months
- Retaining walls4
- New homes3
1 in the last 12 months
- Plumbing, drainage and wastewater3
1 in the last 12 months
- Fires and heating3
typically $3,000
- Garages, sheds and carports3
- Relocated buildings3
typically $98k
- Commercial alterations2
- Minor dwellings and sleepouts1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $75kAn existing building was moved to site 174 McKenzie Road
332 consents
- Plumbing, drainage and wastewater
New Shearer's Quarters and Utility Building with water tanks and on site wastewater system and woodburner
- Pools and spas
BC Amendment due to changes in the roofing detailing, raised pool terrace height, and additional joinery details. All changes listed above have been bubbled in the architectural drawings
- Alterations and additions
Full single storey house, raft slab, timber and steel structure, truss roof. Associated site works. In ground pool and fencing. Decking. Driveway.
- Alterations and additions$75k
An existing building was moved to site
- Alterations and additions
Stage two building consent for a primary residential dwelling
- New homes
New build. 4 bedroom home, with attached garage. multiple cladding types. Retaining walls and pool. Building Consent Amendment due to Joinery suite change.
- Decks, pergolas and verandahs
Alter Interior Layout And Deck
- Alterations and additions$80k
Interior alterations
- New homes
New dwelling with attached garage and pool
- Fires and heating
Install of a Pyroclassic 1V Wood Burner Clean Air, flue and pan flashing
- Minor dwellings and sleepouts
Caretaker’s Cabin with Fireplace
- Alterations and additions
Alterations to Existing Two Storey Dwelling Install Free-Standing Fireplace Includes an amendment: Alter Interior Layout And Deck
- Fires and heating$3,000
Install of a woodsman kanaku free
- Relocated buildings
Proposed 3 bedroom relocated dwelling
- Alterations and additions
PIM Only- Alterations to existing dwelling.
- Retaining walls
Retaining wall construction (inground solider pile wall, reinforced concrete piles and capping beam)
- Alterations and additions
Change to cladding
- Alterations and additions
Amendment To Stone Veneer Cladding Construction
- Relocated buildings
Te Kupenga Farms - House (Dwelling) C: Add in site works to original consent - newly Factory built dwelling being relocated to site, where foundations, construction of garage, veranda, decks and connection to onsite services will be carried out
- Commercial alterations
Te Kupenga Farms - House (Dwelling) D - Prefabricated Single storey to be Constructed in Advance Build Factory in Waipapa and transported to site once we have applied for amendment when all the site information has been received.
- Relocated buildings$98k
Relocatable dwg with new onsite
- Pools and spas
Dwelling with Attached Garage, Detached Shed and Swimming Pool
- New homes
New Dwelling with Attached Garage, Stone cladding, Addition of Inbuilt Fireplace and New Onsite Wastewater System
- Pools and spas
New pool installation
- Retaining walls
Replacement timber retaining wall
ResidentialCommercial The dots are this page of the list.
Near Te Ti Mangonui
Questions
How many building consents were issued in Te Ti Mangonui?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.