Building consents · Stats NZ figures to September 2026
Building consents in Kohukohu
314 new homes were consented in the Far North District council area in the year to September 2026, up 38% on the year before. They also consented $60.7m of non-residential building work, about level with the year before. In the statistical area around Kohukohu, 0 new homes were consented in the same year. Below: 201 consents we hold in Kohukohu, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area, and new homes down to statistical areas, which is how Kohukohu’s own count is made.
New homes consented each month
Dwellings in new building consents, Far North District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 541 in 2004.
New homes in Kohukohu
Stats NZ’s new dwellings for the statistical area Kohukohu sits in (Kohukohu-Broadwood) — the suburb is smaller than one. In the year to September 2026: 0 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Far North District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Education$11.9m
3 buildings · 471 m² new floor area · $4,246/m² new · −13% on the year before
- Hospitals and health$10.7m
4 buildings · 1,584 m² new floor area · $4,962/m² new · +25% on the year before
- Social, cultural and religious$9m
7 buildings · 1,458 m² new floor area · $3,575/m² new · −28% on the year before
- Factories and industrial$7m
8 buildings · 3,705 m² new floor area · $1,421/m² new · −31% on the year before
- Hotels and motels$5.4m
2 buildings · 674 m² new floor area · $6,306/m² new · +1368% on the year before
- Offices$5m
2 buildings · 1,427 m² new floor area · $1,367/m² new · +111% on the year before
- Farm buildings$4.6m
31 buildings · 6,328 m² new floor area · $645/m² new · +40% on the year before
- Warehouses and storage$4.2m
6 buildings · 2,980 m² new floor area · $1,418/m² new · +227% on the year before
- Shops, restaurants and bars$2.9m
1 building · 126 m² new floor area · $2,778/m² new · −65% on the year before
Consents on record in Kohukohu
Individual building consents we hold, each on its property: 201 from 25 Mar 1993 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating6
1 in the last 12 months · typically $3,250
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $49k
- Decks, pergolas and verandahs1
typically $120k
- Fit-outs1
- Multiple homes1
typically $10.3m
- Relocated buildings1
- Alterations and additions1
typically $46k
- Repairs, recladding and strengthening1
- Commercial alterations1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $80kRbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe. 9 Yarborough Street
- $7,000Install of a metro wee rad woody, f 234 West Coast Road
201 consents
- Plumbing, drainage and wastewater$80k
Rbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe.
- Fires and heating$7,000
Install of a metro wee rad woody, f
- Decks, pergolas and verandahs$120k
New exterior timber framed deck, 2m
- Multiple homes$10.3m
Construction of apartment complex (11 units) - subject to section 77 certificate - subject to a waiver of building code clause c3.6 & c3.7
- Commercial alterations
PIM ONLY - Two new factory built dwellings to be delivered to site - 3 bedrooms, a bathroom, living, dining, laundry and kitchen.
- Fires and heating$3,000
Install of a metro wee rad base fre
- Plumbing, drainage and wastewater
Pile foundation works and new onsite wastewater system
- Plumbing, drainage and wastewater$18k
Install onsite wastewater system
- Fit-outs
Internal fit out of two existing vacant buildings and installation of a new Onsite Wastewater Disposal System to establish a ‘Social Enterprise Hub’
- Relocated buildings
Foundations for Relocated Dwelling including Drainage
- Fires and heating$3,000
Install masport free-standing wood
- Fires and heating
Install Masport R1200 Leg Free-Standing Wood Burner
- Alterations and additions$46k
Construct a versatile 600 series ga
- Repairs, recladding and strengthening
Amendment: Stage 2 - Structural integrity - Repiling and roof truss strengthening Physical Works - minor recladding, new disability toilet, kitchen upgrade Compliance - Type 4 fire alarm and smoke detection, uv water treatment. Exterior and interior painting
- Fires and heating$3,500
Metro wee rad leg free-standing woo
- Fires and heating
Install Kea Rad Free Standing Fire and Flue Kit
- Fires and heating
Installation of Jayline SS200L F/S Rural Solid Fuel Woodburner on Custom Hearth
- Fires and heating
Installation of Firenzo Athena Flush solid fuel woodburner into existing structure. Replacement fire.
- Fires and heating$3,000
Install of a metro eco tiny leg fre
- Commercial alterations
Stage 1 - Re-Piling of Main Hall Area Due to Subsidence, Remedial Work Caused By Re-leveling of Structure
- Relocated buildings$58k
Foundations for relocatable detached dwg
- Alterations and additions
Layout Changes and Alterations to Existing Dwelling
- Fires and heating
Install Metro Eco Tiny Rad Free Standing Wood Burner
- Relocated buildings
Foundations and Decks for Relocate Dwelling Constructed in Advance Build Factory and Install an On-Site Wastewater Disposal System
- Fires and heating
Install of a Masport R1200 Ped Free Standing Wood Burner Clean Air, Flue and Pan Flashing
ResidentialCommercial The dots are this page of the list.
Near Kohukohu
Questions
How many building consents were issued in Kohukohu?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.