Building consents · Stats NZ figures to September 2026
Residential building consents in Kohukohu
314 new homes were consented in the Far North District council area in the year to September 2026, up 38% on the year before. Below: 279 residential consents we hold in Kohukohu, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area.
New homes consented each month
Dwellings in new building consents, Far North District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 541 in 2004.
What kind of homes
New dwellings consented in the year to September 2026, by type, with the average floor area and value Stats NZ’s figures give.
- Houses222
132 m² average · $462k average value · +16% on the year before
- Townhouses, flats and units80
76 m² average · $233k average value · +1043% on the year before
- Retirement village units9
100 m² average · $351k average value · −68% on the year before
- Apartments3
326 m² average · $667k average value
Residential consents on record in Kohukohu
Individual building consents we hold, each on its property: 279 from 25 Mar 1993 to 28 Oct 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating12
1 in the last 12 months · typically $3,000
- Alterations and additions5
2 in the last 12 months · typically $26k
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $49k
- Relocated buildings2
- Repairs, recladding and strengthening1
- Decks, pergolas and verandahs1
typically $120k
- Multiple homes1
typically $10.3m
- New homes1
typically $493k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $80kRbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe. 9 Yarborough Street, Kohukohu
- $7,000Install of a metro wee rad woody, f 234 West Coast Road, Kohukohu
279 consents
- Alterations and additions
Minor Ammendment for installation of new lintels to all openings, the introduction of additional point loads, confirmed onsite
- Alterations and additions
Internal alterations to existing dwelling including full layout reconfiguration, removal of walls, installation of new structural beams, new and existing windows/doors. No change to building footprint, height, or floor area
- Plumbing, drainage and wastewater$80k
Rbw - minor renovation to move existing toilet to create separate wc, move location of existing internal walls to create a new walk-in wardrobe.
- Fires and heating$7,000
Install of a metro wee rad woody, f
- Decks, pergolas and verandahs$120k
New exterior timber framed deck, 2m
- Multiple homes$10.3m
Construction of apartment complex (11 units) - subject to section 77 certificate - subject to a waiver of building code clause c3.6 & c3.7
- New homes$493k
Detached dwg & install onsit
- Fires and heating$3,000
Install of a woodsman kanuku free s
- Fires and heating$3,000
Install of a metro trend insert fir
- Fires and heating$3,000
Install of a metro wee rad leg woo
- Fires and heating$3,000
Install of a metro wee rad base fre
- Plumbing, drainage and wastewater
Pile foundation works and new onsite wastewater system
- Plumbing, drainage and wastewater$18k
Install onsite wastewater system
- Relocated buildings
Foundations for Relocated Dwelling including Drainage
- Fires and heating$3,000
Install masport free-standing wood
- Fires and heating
Install Masport R1200 Leg Free-Standing Wood Burner
- Fires and heating
Install of a Free-Standing Wood Burner, Flue and Pan Flashing
- Alterations and additions$5,000
Install new wagener cooktop woodbur
- Alterations and additions$46k
Construct a versatile 600 series ga
- Repairs, recladding and strengthening
Amendment: Stage 2 - Structural integrity - Repiling and roof truss strengthening Physical Works - minor recladding, new disability toilet, kitchen upgrade Compliance - Type 4 fire alarm and smoke detection, uv water treatment. Exterior and interior painting
- Relocated buildings
Relocate Secondhand Dwelling. Install On-Site Wastewater System
- Fires and heating
Installation of Jayline Fr300 Clean Air solid fuel woodburner on existing hearth
- Fires and heating$3,500
Metro wee rad leg free-standing woo
- Fires and heating
Install Kea Rad Free Standing Fire and Flue Kit
- Fires and heating
Metro Wee Rad Leg Free-Standing Solid Fuel Burner and Flue System in Existing Chimney Cavity
ResidentialCommercial The dots are this page of the list.
Suburbs in Kohukohu
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Kohukohu?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.