Building consents · Stats NZ figures to September 2026
Building consents in Māhina Bay
432 new homes were consented in the Lower Hutt City council area in the year to September 2026, down 8% on the year before. They also consented $88.6m of non-residential building work, down 50% on the year before. In the statistical area around Māhina Bay, 2 new homes were consented in the same year. Below: 18 consents we hold in Māhina Bay, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Lower Hutt City council area, and new homes down to statistical areas, which is how Māhina Bay’s own count is made.
New homes consented each month
Dwellings in new building consents, Lower Hutt City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 1,369 in 2022.
New homes in Māhina Bay
Stats NZ’s new dwellings for the statistical area Māhina Bay sits in (Pencarrow) — the suburb is smaller than one. In the year to September 2026: 1 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Lower Hutt City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Education$32m
11 buildings · 4,119 m² new floor area · $4,106/m² new · −39% on the year before
- Factories and industrial$16.2m
6 buildings · 1,477 m² new floor area · $7,888/m² new · +638% on the year before
- Shops, restaurants and bars$15.3m
2 buildings · 385 m² new floor area · $4,883/m² new · +111% on the year before
- Offices$11.6m
3 buildings · 745 m² new floor area · $4,799/m² new · +78% on the year before
- Hospitals and health$5.4m
−94% on the year before
- Social, cultural and religious$4m
3 buildings · 158 m² new floor area · $6,646/m² new · −57% on the year before
- Hotels and motels$2.5m
1 building · 508 m² new floor area · $3,543/m² new
- Hostels, boarding houses and prisons$760k
−60% on the year before
- Warehouses and storage$617k
−87% on the year before
- Farm buildings$215k
2 buildings · 325 m² new floor area · $662/m² new · +95% on the year before
Consents on record in Māhina Bay
Individual building consents we hold, each on its property: 18 from 1 Jul 2019 to 1 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
typically $46k
- Fires and heating4
typically $5,000
- Garages, sheds and carports1
typically $80k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
18 consents
- Alterations and additions$80k
Rbw - housing (detached dwg) - installation of a new self contained lift
- Alterations and additions$1
Amendment 1 - change to structural beams, connections & revised entry decking
- Garages, sheds and carports$80k
Alterations to dwg - conversion of attached gge to two bedrooms, ensuite to existing bdrm & new entry.
- Fires and heating$1
Alt to dwg - installation of Woodsman Serene Petite ULEB, freestanding, dry, woodburner, CAC-212697
- Fires and heating$5,000
Alt to dwg - installation of Masport Osburn 1600, freestanding, dry, woodburner, CAC 90550
- Alterations and additions$12k
Rbw - housing (detached dwg) - dwg alterations - top floor kitchen/lounge area to be opened up with the removal of an internal load bearing wall. New beams & bracing designed by engineer.
- Fires and heating$5,000
Housing (detached dwg) - install a new inbuilt masport le4000 woodburner into a existing chimney (421 marine drive)
- Fires and heating$7,500
Housing - install an ibf firenzo kompact inbuilt woodburner
- Alterations and additions$110k
Rbw - housing - internal work & cladding over existing exterior door
- Alterations and additions$75k
Rbw - res - internal alterations, kitchen, living, external window changes, remove load bearing walls & more
- Alterations and additions$30k
Rbw - res - alterations, reconfigure bdrm & ensuite, add window & more
- Minor dwellings and sleepouts$1,800
Rbw - res - alterations to granny flat, remove internal wall between kitchen & lounge
- Alterations and additions$250k
Two storey add to dwg &
- Fires and heating$6,100
Res - install fsf masport r5000 woodburner
- Alterations and additions$95k
Rbw - res - add to dwg, living & storage areas
- Alterations and additions$18k
Rbw - res - convert existing bdrm into a bathrm
- Retaining walls$21k
Res - driveway retaining wall on the boundary between 37 & 35 mahina Rd
- Plumbing, drainage and wastewater$15k
Res - install bathrm with toilet, sink, shower, wet-room mainly tiled, replace external windows with aluminium
ResidentialCommercial The dots are this page of the list.
Near Māhina Bay
Questions
How many building consents were issued in Māhina Bay?
In the year to September 2026, Stats NZ counted 432 new homes consented in the Lower Hutt City council area, with $176m of residential and $88.6m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.