Building consents · Stats NZ figures to September 2026
Building consents in East Taieri
501 new homes were consented in the Dunedin City council area in the year to September 2026, up 7% on the year before. They also consented $135m of non-residential building work, down 49% on the year before. In the statistical area around East Taieri, 8 new homes were consented in the same year. Below: 166 consents we hold in East Taieri, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Dunedin City council area, and new homes down to statistical areas, which is how East Taieri’s own count is made.
New homes consented each month
Dwellings in new building consents, Dunedin City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 548 in 2021.
New homes in East Taieri
Stats NZ’s new dwellings for the statistical area East Taieri sits in (Taieri) — the suburb is smaller than one. In the year to September 2026: 7 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Dunedin City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$36.8m
4 buildings · 2,575 m² new floor area · $11,379/m² new · −79% on the year before
- Education$26.7m
5 buildings · 1,648 m² new floor area · $4,333/m² new · −10% on the year before
- Offices$19m
3 buildings · 994 m² new floor area · $4,863/m² new · +47% on the year before
- Factories and industrial$17.2m
6 buildings · 3,608 m² new floor area · $3,160/m² new · +41% on the year before
- Hostels, boarding houses and prisons$12.8m
1 building · 504 m² new floor area · $655/m² new · +551% on the year before
- Shops, restaurants and bars$9.4m
2 buildings · 1,169 m² new floor area · $2,737/m² new · +12% on the year before
- Social, cultural and religious$6.5m
3 buildings · 1,404 m² new floor area · $605/m² new · −56% on the year before
- Farm buildings$2.5m
24 buildings · 4,194 m² new floor area · $556/m² new · −9% on the year before
- Warehouses and storage$2.4m
2 buildings · 1,758 m² new floor area · $813/m² new · −35% on the year before
- Hotels and motels$1.9m
−35% on the year before
Consents on record in East Taieri
Individual building consents we hold, each on its property: 166 from 1 Mar 2013 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes26
2 in the last 12 months · typically $583k
- Alterations and additions16
2 in the last 12 months · typically $20k
- Fires and heating14
5 in the last 12 months · typically $7,500
- Garages, sheds and carports9
typically $63k
- Plumbing, drainage and wastewater2
1 in the last 12 months · typically $14k
- Relocated buildings1
1 in the last 12 months · typically $130k
- Repairs, recladding and strengthening1
typically $40k
- Commercial alterations1
typically $50k
- Minor dwellings and sleepouts1
typically $8,000
- Multiple homes1
typically $1.6m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.2mErect shed & dwg with attached gge, install solid fuel heater, water tanks & septic system with effluent field 66 Riccarton Road East
- $566kNew dwg with attached gge 5 Petre Lane
- $500kErect attached dwg, install solid fuel burner, convert kitchen to games room 103 Gladstone Road South
- $130kReclad relocated dwg, construct foundations, connect to services 47 Riccarton Road East
- $50kAlt bathrm & ensuite layout in dwg, install wet area shower 21 Orchard Grove
166 consents
- Plumbing, drainage and wastewater$23k
Construct foul & stormwater drainage
- Relocated buildings$130k
Reclad relocated dwg, construct foundations, connect to services
- New homes$500k
Erect attached dwg, install solid fuel burner, convert kitchen to games room
- New homes$566k
New dwg with attached gge
- Fires and heating$1.2m
Erect shed & dwg with attached gge, install solid fuel heater, water tanks & septic system with effluent field
- Fires and heating$5,000
Removing exsiting cracked fire & replacing with new fire & flue
- Alterations and additions$5,000
Install 2x windows on ground floor of dwg
- Fires and heating$8,000
Install solid fuel burner in dwg
- Alterations and additions$50k
Alt bathrm & ensuite layout in dwg, install wet area shower
- Fires and heating$14k
Install solid fuel burner in dwg
- Fires and heating$6,800
Install woodsman Tarras mk111 freestanding fire & flue.
- Alterations and additions$5,000
Amendment to aba-2024-1993 - delete ceiling diaphragm, relocate attic ladder, revise foundation, study nook, bulkhead, bracing, shower drain & stormwater drainage
- Alterations and additions$88k
Rbw bathrm alt
- Fires and heating$4m
Extend & alt dwg, install spatherm varia bh-p7 heater (x2), escea ek1550 outdoor heater, & vestner lift
- Commercial alterations$50k
Alt dwg - create open plan kitchen & dining, relocate office to form ensuite, install woodsman kanaku heater & hot water cylinder
- Alterations and additions$1
Amendment 1 - change layout at main entrance, includes repositioning an internal door to new wall
- Fires and heating$9,000
Install metro ambie plus heater in dwg
- Fires and heating$7,000
Install yunca wegj 2000 heater in dwg
- New homes$1.4m
New dwg with attached garages, install taurus visionline heater in dwg & asport Matakana outdoor heater, construct retaining wall
- New homes$700k
Demolish fire damaged dwg & new dwg with attached gge on existing foundation, install escea ds1650 frameless gas heater
- Alterations and additions$15k
Alt dwg - convert wardrobe to ensuite (wet-area shower), alt layout of bdrm & install insulation to ensuite external wall
- Alterations and additions$30k
Alt dwg - alt layout to form ensuite & laundry
- Garages, sheds and carports$45k
Erect gge
- Garages, sheds and carports$500k
Alt of existing kitchen & entrance hall, add of gge & master bdrm
- Alterations and additions$5,000
Amendment to ABA-2022-2136 - raise finished floor level, construct bay window in media room & gge, change gable roof to hip roof & change roofing
ResidentialCommercial The dots are this page of the list.
Near East Taieri
Questions
How many building consents were issued in East Taieri?
In the year to September 2026, Stats NZ counted 501 new homes consented in the Dunedin City council area, with $256m of residential and $135m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.