Building consents · Stats NZ figures to September 2026
Building consents in Lepperton
325 new homes were consented in the New Plymouth District council area in the year to September 2026, down 5% on the year before. They also consented $87.3m of non-residential building work, up 72% on the year before. In the statistical area around Lepperton, 7 new homes were consented in the same year. Below: 56 consents we hold in Lepperton, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the New Plymouth District council area, and new homes down to statistical areas, which is how Lepperton’s own count is made.
New homes consented each month
Dwellings in new building consents, New Plymouth District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 708 in 2021.
New homes in Lepperton
Stats NZ’s new dwellings for the statistical area Lepperton sits in (Lepperton-Brixton) — the suburb is smaller than one. In the year to September 2026: 7 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — New Plymouth District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Social, cultural and religious$29.1m
3 buildings · 9,368 m² new floor area · $2,829/m² new · +112% on the year before
- Education$12.3m
1 building · 1,337 m² new floor area · $3,740/m² new · +152% on the year before
- Warehouses and storage$12.2m
6 buildings · 12,575 m² new floor area · $974/m² new · +880% on the year before
- Hospitals and health$8.5m
1 building · +34471% on the year before
- Factories and industrial$8.3m
7 buildings · 5,131 m² new floor area · $1,473/m² new · +84% on the year before
- Shops, restaurants and bars$6.5m
2 buildings · 294 m² new floor area · $4,932/m² new · −41% on the year before
- Offices$6.5m
3 buildings · 1,833 m² new floor area · $2,428/m² new · −35% on the year before
- Farm buildings$3.9m
29 buildings · 14,657 m² new floor area · $253/m² new · −22% on the year before
- Hotels and motels$31k
−89% on the year before
Consents on record in Lepperton
Individual building consents we hold, each on its property: 56 from 1 Sep 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating13
1 in the last 12 months · typically $5,000
- Alterations and additions9
1 in the last 12 months · typically $60k
- New homes5
1 in the last 12 months · typically $806k
- Garages, sheds and carports3
typically $40k
- Decks, pergolas and verandahs1
typically $23k
- Commercial alterations1
typically $90k
- Multiple homes1
typically $750k
- Pools and spas1
typically $100k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $806kThree bdrm dwg with attached gge. 270 Richmond Road
- $100kHouse extension 508C Richmond Road
- $8,000Installation of firenzo vision log fire 357-359 Richmond Road
56 consents
- Alterations and additions$100k
House extension
- New homes$806k
Three bdrm dwg with attached gge.
- Fires and heating$8,000
Installation of firenzo vision log fire
- Commercial alterations$90k
Res/farm - storage shed / workshop with toilet & shower facilities
- Alterations and additions$300k
Res/farm - alterations & additions to dwg
- Alterations and additions$18k
Res/farm - add of ensuite & wardrobe
- Fires and heating$2,000
Freestanding - masport Kaituna ped freestanding wood burner
- Alterations and additions$61k
Res/farm - relocate brand new yard build three bdrm home to site. Also construct a gge onsite - foundations & services only.
- Fires and heating$5,000
Freestanding - firenzo contessa freestanding woodfire c/w wetback
- New homes$950k
Res/farm - three bdrm dwg with attached gge
- Fires and heating$5,000
Install woodsman flare heater, ecan # 134775, no wetback
- New homes$770k
Other res/farm - four bdrm dwg with attached dbl gge
- Fires and heating$7,000
Freestanding - install metro wee rad base free standing wood fire
- Fires and heating$2,000
Freestanding - install masport Kaituna ped freestanding wood burner
- Alterations and additions$60k
Res/farm - extension of existing outdoor alfresco area
- Pools and spas$100k
Res/farm - pool & fencing
- Fires and heating$5,500
Freestanding - install metro wee rad base freestanding wood fire
- Garages, sheds and carports$20k
Shed
- Fires and heating$6,242
Install solid fuel heater - metro wee rad base f/s woodburner & remove old sfh
- New homes$850k
Res/farm - new 3 bdrm dwg (sol)
- Garages, sheds and carports$40k
Res/farm - shed
- New homes$800k
Res/farm- four bdrm dwg with single attached gge
- Alterations and additions$90k
Rbw - alt to existing bathrm & installation of new joinery on the west elevation
- Alterations and additions$45k
Res/farm - ensuite & wardrobe add (p)
- Garages, sheds and carports$100k
Res/farm - 20mx10m gge
ResidentialCommercial The dots are this page of the list.
Near Lepperton
Questions
How many building consents were issued in Lepperton?
In the year to September 2026, Stats NZ counted 325 new homes consented in the New Plymouth District council area, with $194m of residential and $87.3m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.