Building consents · Stats NZ figures to September 2026
Commercial building consents in Ōkaihau
Councils consented $60.7m of non-residential building work in the Far North District council area in the year to September 2026, about level with the year before. Below: 76 commercial consents we hold in Ōkaihau, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Far North District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Education$11.9m
3 buildings · 471 m² new floor area · $4,246/m² new · −13% on the year before
- Hospitals and health$10.7m
4 buildings · 1,584 m² new floor area · $4,962/m² new · +25% on the year before
- Social, cultural and religious$9m
7 buildings · 1,458 m² new floor area · $3,575/m² new · −28% on the year before
- Factories and industrial$7m
8 buildings · 3,705 m² new floor area · $1,421/m² new · −31% on the year before
- Hotels and motels$5.4m
2 buildings · 674 m² new floor area · $6,306/m² new · +1368% on the year before
- Offices$5m
2 buildings · 1,427 m² new floor area · $1,367/m² new · +111% on the year before
- Farm buildings$4.6m
31 buildings · 6,328 m² new floor area · $645/m² new · +40% on the year before
- Warehouses and storage$4.2m
6 buildings · 2,980 m² new floor area · $1,418/m² new · +227% on the year before
- Shops, restaurants and bars$2.9m
1 building · 126 m² new floor area · $2,778/m² new · −65% on the year before
Non-residential work since 1991
The value consented each year, in the dollars of the day (not adjusted for inflation).
Commercial consents on record in Ōkaihau
Individual building consents we hold, each on its property: 76 from 31 Mar 2000 to 20 Aug 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations6
typically $87k
- Farm buildings1
- Relocated buildings1
Consents on record by month
The last three years. A recent dip is often records still to arrive.
76 consents
- Relocated buildings
Relocate a new factory built dwelling to site and connect to existing onsite wastewater disposal system
- Commercial alterations
PIM Only – New Factory Built Dwelling with 2 Bedrooms, 2 Bathrooms, Living and Kitchen Area and Deck Area
- Commercial alterations$87k
Construct a Versatile 600 series gge with occupied gym outbuildings
- Commercial alterations
Puketawa Marae Site consent for foundations, all drainage for stormwater and waste water for 5 x pre built emergency cabins (HUD) as part of the Cyclone Gabrielle Recovery programe that will be delivered to site.
- Commercial alterations
PIM ONLY - Upgrade to existing Marae
- Commercial alterations
PIM ONLY - New Factory built dwelling with 4 bedrooms, 2 bathrooms, laundry, living and kitchen and deck area
- Commercial alterations
Pim Only: New Factory Built Dwelling
- Farm buildings
Construct Barn and Implement Shed, Install On-Site Wastewater System
- Commercial alterations
Detached Garage/Office with Bathroom Connect to Existing OSD
- Commercial alterations
Versatile 600 Series Garage Workshop
- New commercial buildings
Construct a Versatile Garage/Workshop with Storage and Bathroom.
- Commercial alterations
Studio/ Workshop Shed and Install On-Site Wastewater Disposal System
- Farm buildings
3 Bay Pole Shed with Bathroom, Lunchroom and Office
- Commercial alterations
Remove Deck Extension, Commercial Kitchen And Septic Tank From Consented Plans
- Commercial alterations
Foundations for 2 Relocated Classrooms and Covered Decks
- Farm buildings
Construct a New 2 Bay Implement Shed
- Farm buildings
Erect 3 Bay Implement Shed
- Farm buildings
Construct a New Implement Shed
- New commercial buildings
Construct a New 4 Bedroom Dwelling with Office, Attached Garage and Onsite Waste Water System - Lot 2 DP 507476
- New commercial buildings
Construct a New 3 Bay Monoslope Garage/Workshop
- Commercial alterations
Prefabricated Dwelling Built in Advance Build Factory with Foundations, Decks and Connections to Services Once On Site Including On-Site Effluent Disposal System
- Commercial alterations
Prefabricated Dwelling Built in Advance Manufacturing Factory and Relocated to Site - Foundations, Decks and Installation of On-Site Effluent Disposal System Once On Site
- Farm buildings
Construct Greenwood Implement Shed
- Commercial alterations
Gable Storage Warehouse and Lean-to to existing Slab Wall
- Farm buildings
Construct Five Bay Implement Shed
ResidentialCommercial The dots are this page of the list.
Suburbs in Ōkaihau
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Ōkaihau?
In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.