44 new homes were consented in the Ōpōtiki District council area in the year to September 2026, down 8% on the year before. They also consented $6.7m of non-residential building work, down 45% on the year before. In the statistical area around Waiotahe, 7 new homes were consented in the same year. Below: 130 consents we hold in Waiotahe, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Ōpōtiki District council area, and new homes down to statistical areas, which is how Waiotahe’s own count is made.
New homes consented each month
Dwellings in new building consents, Ōpōtiki District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 57 in 1998.
New homes in Waiotahe
Stats NZ’s new dwellings for the statistical area Waiotahe sits in (Waiotahe) — the suburb is smaller than one. In the year to September 2026: 7 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Ōpōtiki District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Warehouses and storage$5m
3 buildings · 4,608 m² new floor area · $1,074/m² new · +5756% on the year before
- Hospitals and health$1.2m
- Farm buildings$270k
2 buildings · 332 m² new floor area · $813/m² new · +52% on the year before
- Education$174k
−95% on the year before
- Offices$56k
−98% on the year before
- Shops, restaurants and bars$10k
−98% on the year before
Consents on record in Waiotahe
Individual building consents we hold, each on its property: 130 from 1 Jul 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes24
3 in the last 12 months · typically $474k
- Fires and heating19
4 in the last 12 months · typically $5,000
- Alterations and additions14
typically $55k
- Garages, sheds and carports9
2 in the last 12 months · typically $49k
- Multiple homes5
1 in the last 12 months · typically $1.3m
- Plumbing, drainage and wastewater5
typically $5,250
- Relocated buildings4
3 in the last 12 months · typically $64k
- Pools and spas4
1 in the last 12 months · typically $7,500
- Minor dwellings and sleepouts3
typically $7,000
- Commercial alterations1
typically $90k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.8mRbw - five new two-storey attached dwgs. Dw 1 has 4 bedrooms, 3 bathrooms, & dw 2 - 5 have 3 bedrooms, 2.5 bathrooms, a single-car gge, & private drainage. Includes timber & keystone ret 3 Rimu Rimu Key
- $455kNew 3 bedroom dwelling
- $400kNew 3 bdrm home on piles with attached gge 36 Paerata Ridge Road
- $95kSiting of new transportable dwg onsite to timber pile foundation system & associated onsite service connections. 81A Waiōtahe Drifts Boulevard
- $72kRbw access, foundations, plumbing / drainage & re-clad for relocated dwg 7 Rimu Rimu Key
130 consents
- Multiple homes$1.8m
Rbw - five new two-storey attached dwgs. Dw 1 has 4 bedrooms, 3 bathrooms, & dw 2 - 5 have 3 bedrooms, 2.5 bathrooms, a single-car gge, & private drainage. Includes timber & keystone ret
- Relocated buildings$15k
Relocation of kitchen within same room. Removal of existing detached dwgs
- Fires and heating$6,000
Remove existing wood-burner & replace with new
- Relocated buildings$72k
Rbw access, foundations, plumbing / drainage & re-clad for relocated dwg
- New homes$455k
New 3 bedroom dwelling
- Fires and heating$4,000
Install fireplace
- Garages, sheds and carports$55k
To construct a gge on a shared boundary wall
- Fires and heating$8,000
Install masport solid fuel heater Akaroa mkii
- New homes$95k
Siting of new transportable dwg onsite to timber pile foundation system & associated onsite service connections.
- Garages, sheds and carports$53k
Erect block party wall on boundary & new gge to property
- Fires and heating$3,000
Fireplace
- Relocated buildings$55k
Relocatable dwg. Install 3-waters
- Pools and spas$8,000
Pool fencing
- New homes$400k
New 3 bdrm home on piles with attached gge
- New homes$250k
New one bdrm dwg of 56.73m2 with front & rear decks of 49.91m2 & associated 3w infrastructure.
- New homes$400k
Construct new dwg
- New homes$1m
New 231m2, split level, 4 bdrm dwg with attached dbl gge. Conc raft floor, timber subfloor, timber wall & roof framing. Vertical wb cladding, longrun roofing.
- New homes$398k
Construct a 3 bdrm dwg
- Fires and heating$2,500
Install new solid fuel heater/fireplace into lounge manufacture- woodsman model- Tasman mk2 freestanding fire fluekit-heat saver flue kit hearth-1300 tiled corner with rims edge roof material-corrugate .40g colorsteel maxx flashings-colorsteel maxx
- Fires and heating$4,000
Replace existing fireplace with new woodsman log burner & new flue
- New homes$1.2m
New 330m2 2 storey (in part) dwg with concrete raft floor, foundation retaining walls, timber wall, midfloor & roof framing, weatherboard cladding & colorsteel roof.
- Alterations and additions$5,000
Proposed new fire installation-freestanding metrofire tiny rad woody base
- New homes$1.3m
292m2 res dwg. Two stories in part. Concrete foundations, timber subfloor, timber wall & roof framing, innova cladding with colorsteel roof.
- Garages, sheds and carports$1,000
Installing a bathrm in the existing gge, that has had the doors filled in to turn into accommodation.
- New homes$980k
290m2 2 storey dwg with attached gge & covered decks
ResidentialCommercial The dots are this page of the list.
Near Waiotahe
Questions
How many building consents were issued in Waiotahe?
In the year to September 2026, Stats NZ counted 44 new homes consented in the Ōpōtiki District council area, with $19.1m of residential and $6.7m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.