Building consents · Stats NZ figures to September 2026
Residential building consents in Te Kiri
65 new homes were consented in the South Taranaki District council area in the year to September 2026, up 3% on the year before. In the statistical area around Te Kiri, 2 new homes were consented in the same year. Below: 5 residential consents we hold in Te Kiri, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the South Taranaki District council area, and new homes down to statistical areas, which is how Te Kiri’s own count is made.
New homes consented each month
Dwellings in new building consents, South Taranaki District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 100 in 2007.
What kind of homes
New dwellings consented in the year to September 2026, by type, with the average floor area and value Stats NZ’s figures give.
- Houses57
183 m² average · $571k average value · +33% on the year before
- Townhouses, flats and units8
107 m² average · $371k average value · −50% on the year before
New homes in Te Kiri
Stats NZ’s new dwellings for the statistical area Te Kiri sits in (Taungatara) — the suburb is smaller than one. In the year to September 2026: 2 houses, 0 townhouses and units, 0 apartments.
Residential consents on record in Te Kiri
Individual building consents we hold, each on its property: 5 from 1 Jul 2021 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating2
typically $7,250
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $12k
- Multiple homes1
1 in the last 12 months · typically $2.2m
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.2mRbw - construction of four detached two-storey dwgs with retaining walls. Lots 1, 3 & 4 include four bedrooms, 2.5 bathrooms, & a single internal gge; lot 2 includes five bedrooms, three b 20 Lower Kiri Road
- $12kCertificate of acceptance: plumbing & drainage to facilities for buildings constructed under schedule 1 2685 Eltham Road
5 consents
- Multiple homes$2.2m
Rbw - construction of four detached two-storey dwgs with retaining walls. Lots 1, 3 & 4 include four bedrooms, 2.5 bathrooms, & a single internal gge; lot 2 includes five bedrooms, three b
- Plumbing, drainage and wastewater$12k
Certificate of acceptance: plumbing & drainage to facilities for buildings constructed under schedule 1
- Fires and heating$7,000
Install metro smart insert fire into existing brick cavity in the lounge area of the home
- Fires and heating$7,500
Install metro xtreme rad (leg) freestanding logfire with wetback
- Fires and heating$1,950
Install metro ca xtreme rad- legs f/stdg logfire
ResidentialCommercial The dots are this page of the list.
Near Te Kiri
Questions
How many building consents were issued in Te Kiri?
In the year to September 2026, Stats NZ counted 65 new homes consented in the South Taranaki District council area, with $48.3m of residential and $32.5m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.