Building consents · Stats NZ figures to September 2026
Residential building consents in Ōrere Point
17,131 new homes were consented in the Auckland council area in the year to September 2026, up 16% on the year before. Below: 27 residential consents we hold in Ōrere Point, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Auckland council area.
New homes consented each month
Dwellings in new building consents, Auckland, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 21,301 in 2022.
What kind of homes
New dwellings consented in the year to September 2026, by type, with the average floor area and value Stats NZ’s figures give.
- Townhouses, flats and units8,960
112 m² average · $353k average value · +9% on the year before
- Houses6,426
184 m² average · $610k average value · +36% on the year before
- Apartments1,347
88 m² average · $339k average value · −18% on the year before
- Retirement village units398
129 m² average · $550k average value · +88% on the year before
Local boards compared
The year to September 2026 against the year before.
| Local board | New homes | Change |
|---|---|---|
| Howick | 1,712 | +28% |
| Henderson-Massey | 1,592 | +15% |
| Franklin | 1,214 | +14% |
| Albert-Eden | 1,123 | +103% |
| Maungakiekie-Tamaki | 1,118 | −23% |
| Papakura | 1,107 | +33% |
| Manurewa | 976 | +32% |
| Hibiscus and Bays | 967 | 0% |
| Rodney | 951 | +12% |
| Kaipatiki | 942 | +44% |
| Mangere-Otahuhu | 940 | +31% |
| Orakei | 795 | +1% |
| Whau | 790 | +43% |
| Upper Harbour | 749 | +29% |
| Otara-Papatoetoe | 692 | −14% |
| Puketapapa | 588 | +66% |
| Devonport-Takapuna | 478 | +19% |
| Waitakere Ranges | 200 | −28% |
| Waitemata | 153 | −60% |
| Waiheke | 41 | 0% |
| Great Barrier | 3 | −57% |
Residential consents on record in Ōrere Point
Individual building consents we hold, each on its property: 27 from 1 Sep 2020 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating6
2 in the last 12 months · typically $6,600
- New homes6
1 in the last 12 months · typically $580k
- Alterations and additions4
typically $78k
- Garages, sheds and carports3
typically $45k
- Relocated buildings2
1 in the last 12 months · typically $145k
- Decks, pergolas and verandahs2
typically $103k
- Retaining walls1
typically $10k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $662kRbw - construction of a single level detached dwg consisting of three bedrooms & attached gge, onsite wastewater system & solid fuel heater. 54 Orere Point Road, Ōrere Point
- $40kRbw - remove existing shed. Proposed 2nd hand relocated dwg. Add septic & water tank. 97 Bays Road, Ōrere Point
- $6,700Replacing old woodfire with new metro wee rad leg 41 Bays Road, Ōrere Point
- $6,000Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications - maxen forsbury 550 replaces existing wood fire. 148 Howard Road, Ōrere Point
27 consents
- Fires and heating$6,700
Replacing old woodfire with new metro wee rad leg
- Relocated buildings$40k
Rbw - remove existing shed. Proposed 2nd hand relocated dwg. Add septic & water tank.
- New homes$662k
Rbw - construction of a single level detached dwg consisting of three bedrooms & attached gge, onsite wastewater system & solid fuel heater.
- Fires and heating$6,000
Sfh fixed fee - installation of a solid fuel heater to manufacturers specifications - maxen forsbury 550 replaces existing wood fire.
- Garages, sheds and carports$70k
Outbuilding - rebuild of fire damaged standalone dbl gge
- Fires and heating$6,500
Installation of a solid fuel heater to manufacturers specifications masport Kaituna ped uleb replaces existing wood fire
- Decks, pergolas and verandahs$115k
Proposed deck & renovation. New shower added to ground floor & altered layout
- New homes$556k
Pbc e2e: rbw - new dwg with 3 bedrooms, 2 bathrooms & attached gge. Onsite wastewater & stormwater disposal systems
- Alterations and additions$35k
Rbw - housing (detached dwg) - add of a family & storage room with timber framing over existing skillion roof below. Extension supported by the framing & existing subfloor.
- Alterations and additions$120k
Amendment to bco10376286 - creation of new bdrm with ensuite in existing rumpus room
- Alterations and additions$25k
Rbw - alterations to the existing dwg. Existing wardrobe to be converted to a wc room. Ensuite to be added to existing bdrm
- New homes$250k
Rbw - proposed timber framed gge & a minor dwg consisting of engineered foundation concrete slab with standard truss roof construction.One bdrm with bathrm & kitchen with dbl bay g
- Fires and heating$7,691
Replacing existing woodfire with brand new woodfire (metro mega rad)
- New homes$604k
Rbw - a new single-level dwg with three bedrooms, an ensuite, a bathrm, an open-plan kitchen space, & attached gge with laundry located in the gge space.
- Alterations and additions$200k
Amendment: roof configuration minor add to west/south & internal layout reconfiguration
- Garages, sheds and carports$44k
Rbw - pbc e2e - new gge.
- Fires and heating$8,000
Installation of replacement freestanding solid fuel heater
- Relocated buildings$250k
Rbw relocating an existing dwg from 17 Glenside Ave, Pakuranga to site. Dwg to be compliant with building code & re braced for the new site.
- New homes$737k
Dbc -rbw new single-storey dwg with 4 bedrooms, 2 bathrooms, 1 wc & attached dbl gge, portico, private drainage, water tanks & on-site effluent system.
- Decks, pergolas and verandahs$90k
Add 61sqm deck & 13sqm pergola - all timber construction.
- Fires and heating$5,858
installation of brand new smart insert ht woodfire
- New homes$400k
Rbw - new single storey four-bdrm home, & drainage, two bathrooms, one wc, & attached gge.
- Retaining walls$10k
new gabion retaining wall - 1x2x1m
- Garages, sheds and carports$45k
Construction of new 36 sqm dbl gge.
- Fires and heating$6,400
installation of a solid woodfire - free standing kent Benmore
ResidentialCommercial The dots are this page of the list.
Suburbs in Ōrere Point
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Ōrere Point?
In the year to September 2026, Stats NZ counted 17,131 new homes consented in the Auckland council area, with $8.53b of residential and $3.37b of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.