Building consents · Stats NZ figures to September 2026
Commercial building consents in Pahiatua
Councils consented $17.9m of non-residential building work in the Tararua District council area in the year to September 2026, up 222% on the year before. Below: 8 commercial consents we hold in Pahiatua, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Tararua District council area.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Tararua District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Social, cultural and religious$9.5m
1 building · 1,170 m² new floor area · $8,120/m² new · +694% on the year before
- Farm buildings$3m
23 buildings · 4,758 m² new floor area · $511/m² new · +256% on the year before
- Education$2.3m
+7% on the year before
- Offices$1.4m
1 building · 165 m² new floor area · $2,727/m² new
- Factories and industrial$1.3m
+205% on the year before
- Shops, restaurants and bars$349k
1 building · 93 m² new floor area · $1,720/m² new · −46% on the year before
- Hotels and motels$25k
Non-residential work since 1991
The value consented each year, in the dollars of the day (not adjusted for inflation).
Commercial consents on record in Pahiatua
Individual building consents we hold, each on its property: 8 from 1 Jan 2021 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fit-outs4
1 in the last 12 months · typically $125k
- New commercial buildings2
typically $200k
- Commercial alterations1
typically $35k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $100kInterior medical Centre fit out to existing commercial building unit - unit 1a 4 Main Street, Pahiatua
8 consents
- Fit-outs$100k
Interior medical Centre fit out to existing commercial building unit - unit 1a
- Fit-outs$600k
Rbw - factory build of new four bdrm dwg clad with timber weatherboards & timber panels & corrugated roofing. Internal fit out of kitchen & bathrm with provisions for future drainage.
- Fit-outs$150k
Rbw - proposed factory build of new 3-bdrm dwg clad with timber weatherboards & timber panels & standing seam roofing. Internal fit out of kitchen & bathrm with provisions for future drainag
- Commercial alterations$35k
Replace existing St front verandah. Upgrade facade above commercial
- New commercial buildings$250k
rbw proposed factory build of new 3 bdrm dwg clad with timber weatherboards corrugated roofing built in 2 modules. Provisions for future sanitary fixtures. Dwg to be re sited & sanitary fixtures installed under separate buil
- New commercial buildings$150k
Rbw proposed factory build of new 2 bdrm dwg clad with timber weatherboards & corrugate roofing built in 1 module. Provisions for future sanitary fixtures. Dwg to be re sited & sanitary fixtures installed under separate building con
- Fit-outs$20k
Housing (multi-unit dwg) - re-roof - concrete tile to corrugate inter-tenancy wall to roof fire stopping detail
- Commercial alterations$35k
Gge/workshop
ResidentialCommercial The dots are this page of the list.
Suburbs in Pahiatua
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Pahiatua?
In the year to September 2026, Stats NZ counted 33 new homes consented in the Tararua District council area, with $24.1m of residential and $17.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.