Building consents · Stats NZ figures to September 2026
Building consents in Fordlands
457 new homes were consented in the Rotorua District council area in the year to September 2026, up 1% on the year before. They also consented $66.9m of non-residential building work, up 43% on the year before. In Fordlands itself, 7 new homes were consented in the same year. Below: 63 consents we hold in Fordlands, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Rotorua District council area, and new homes down to statistical areas, which is how Fordlands’s own count is made.
New homes consented each month
Dwellings in new building consents, Rotorua District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 678 in 2024.
New homes in Fordlands
Stats NZ’s new dwellings for the statistical area that make up most of it: Fordlands. In the year to September 2026: 7 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Rotorua District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hotels and motels$27.7m
1 building · 253 m² new floor area · $2,372/m² new · +278% on the year before
- Factories and industrial$10.1m
4 buildings · 3,656 m² new floor area · $1,550/m² new · +54% on the year before
- Education$7.2m
5 buildings · 951 m² new floor area · $4,601/m² new · −30% on the year before
- Hospitals and health$6.5m
1 building · 51 m² new floor area · $3,412/m² new · +1323% on the year before
- Social, cultural and religious$6.2m
5 buildings · 232 m² new floor area · $4,483/m² new · +181% on the year before
- Farm buildings$3.9m
23 buildings · 7,548 m² new floor area · $477/m² new · +11% on the year before
- Shops, restaurants and bars$3.5m
−40% on the year before
- Offices$1.8m
1 building · 143 m² new floor area · $5,245/m² new · +34% on the year before
- Warehouses and storage$93k
1 building · 30 m² new floor area · $1,567/m² new · −99% on the year before
Consents on record in Fordlands
Individual building consents we hold, each on its property: 63 from 1 Aug 2019 to 1 May 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating7
typically $5,500
- New homes4
typically $276k
- Alterations and additions2
typically $35k
- Multiple homes1
1 in the last 12 months · typically $2.9m
- Garages, sheds and carports1
typically $55k
- Plumbing, drainage and wastewater1
typically $19k
- Repairs, recladding and strengthening1
typically $240k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.9mSix new dwgs 2A Waterlow Street
63 consents
- Multiple homes$2.9m
Six new dwgs
- Repairs, recladding and strengthening$240k
Reinstate fire damage to house
- Fires and heating$6,500
Masport Rangitata insert woodfire
- Alterations and additions$50k
Extend existing dwg to create bdrm & ensuite
- Fires and heating$7,000
Free standing fire
- Plumbing, drainage and wastewater$19k
Revised drainage plan & proposed ww pump chamber for flat two & three.
- Fires and heating$7,000
Alt to dwg - installation of Masport Waimakariri Ash, freestanding, dry, woodburner - CAC 203573
- Alterations and additions$20k
Bathrm alterations including wet shower install
- Fires and heating$5,500
Install masport Rangitata inbuilt woodburner
- New homes$409k
New dwg
- New homes$351k
New dwg
- New homes$55k
Transportable dwg
- Fires and heating$5,500
Masport Rangitata insert fire
- Fires and heating$5,000
Install metro smart insert fire
- Garages, sheds and carports$55k
New shed
- Fires and heating$5,000
Masport Rangitata i/b woddburner
- New homes$200k
New subsidiary dwg
- Insulation$50k
Alterations: insulation, new interior lining & install bracing
- New homes$150k
New dwg
- Fires and heating$4,500
Masport r5000 f/s woodburner
- Fires and heating$5,051
Metro wee rad v2 f/s woodburner
- Alterations and additions$50k
2x new relocated modular units
- Insulation$50k
Alterations: wall insulation, new walls, level shower, install lintels, plies & bracing
- Repairs, recladding and strengthening$10k
New lintels & piles(7/4/21)
- Repairs, recladding and strengthening$10k
New lintels & piles(31/3/21)
ResidentialCommercial The dots are this page of the list.
Near Fordlands
Questions
How many building consents were issued in Fordlands?
In the year to September 2026, Stats NZ counted 457 new homes consented in the Rotorua District council area, with $193m of residential and $66.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.