Building consents · Stats NZ figures to September 2026
Building consents in Takanini
17,131 new homes were consented in the Auckland council area in the year to September 2026, up 16% on the year before. They also consented $3.37b of non-residential building work, up 5% on the year before. Below: 87 consents we hold in Takanini, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Auckland council area.
New homes consented each month
Dwellings in new building consents, Auckland, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 21,301 in 2022.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Auckland, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$753m
43 buildings · 26,927 m² new floor area · $8,567/m² new · −24% on the year before
- Warehouses and storage$631m
84 buildings · 233,139 m² new floor area · $2,450/m² new · +9% on the year before
- Education$590m
77 buildings · 54,555 m² new floor area · $8,792/m² new · +4% on the year before
- Factories and industrial$402m
44 buildings · 21,405 m² new floor area · $14,113/m² new · −5% on the year before
- Shops, restaurants and bars$307m
32 buildings · 40,270 m² new floor area · $4,291/m² new · +19% on the year before
- Hospitals and health$219m
29 buildings · 19,980 m² new floor area · $6,216/m² new · +41% on the year before
- Hostels, boarding houses and prisons$197m
11 buildings · 25,285 m² new floor area · $7,276/m² new · +218% on the year before
- Social, cultural and religious$167m
29 buildings · 11,019 m² new floor area · $3,823/m² new · +62% on the year before
- Hotels and motels$75.4m
17 buildings · 13,619 m² new floor area · $3,956/m² new · +37% on the year before
- Farm buildings$26.2m
121 buildings · 68,341 m² new floor area · $353/m² new · +4% on the year before
Local boards compared
The year to September 2026 against the year before.
| Local board | New homes | Change | Non-residential | Change |
|---|---|---|---|---|
| Howick | 1,712 | +28% | $95.3m | −75% |
| Henderson-Massey | 1,592 | +15% | $101m | −39% |
| Franklin | 1,214 | +14% | $195m | −12% |
| Albert-Eden | 1,123 | +103% | $270m | +37% |
| Maungakiekie-Tamaki | 1,118 | −23% | $295m | +37% |
| Papakura | 1,107 | +33% | $90.9m | +81% |
| Manurewa | 976 | +32% | $168m | +225% |
| Hibiscus and Bays | 967 | 0% | $44.7m | 0% |
| Rodney | 951 | +12% | $73.7m | −10% |
| Kaipatiki | 942 | +44% | $51.2m | +23% |
| Mangere-Otahuhu | 940 | +31% | $582m | −16% |
| Orakei | 795 | +1% | $52.7m | +10% |
| Whau | 790 | +43% | $58.1m | +13% |
| Upper Harbour | 749 | +29% | $211m | +1% |
| Otara-Papatoetoe | 692 | −14% | $85.2m | −53% |
| Puketapapa | 588 | +66% | $18.1m | −42% |
| Devonport-Takapuna | 478 | +19% | $50.9m | +43% |
| Waitakere Ranges | 200 | −28% | $14.7m | +90% |
| Waitemata | 153 | −60% | $907m | +83% |
| Waiheke | 41 | 0% | $2m | −83% |
| Great Barrier | 3 | −57% | $210k | +200% |
Consents on record in Takanini
Individual building consents we hold, each on its property: 87 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions21
7 in the last 12 months · typically $70k
- Fires and heating7
2 in the last 12 months · typically $6,912
- New homes6
1 in the last 12 months · typically $442k
- Pools and spas5
1 in the last 12 months · typically $6,000
- Minor dwellings and sleepouts3
typically $99k
- Garages, sheds and carports3
typically $40k
- Commercial alterations2
typically $40k
- Insulation1
typically $2,200
- Repairs, recladding and strengthening1
typically $5,000
- Retaining walls1
typically $40k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $196kRbw - add to an existing dwg & minor dwg including new roof, walls, windows & private drainage. Retaining wall. 4 Challen Close, Conifer Grove
- $99kRbw - removal of internal wing wall between the dining & family rooms, replaced with a new beam. Construction of a new single-storey minor dwg consisting of one bdrm & one bathrm. Includ 37 Keywella Drive, Conifer Grove
- $80kRbw - new ensuite & wc to be constructed within existing hallway. Bdrm 3 divided into two separate rooms (new study). Removal of selected windows. Remove existing hardiplank cladding & replace wi 10 Gardone Terrace, Conifer Grove
- $60kRbw - internal alterations to include: install new wc in bathrm, move back door out, remove internal walls, mover front entrance & create new entry lobby. Install new door to rear of gge. 4 Gulliver Place, Conifer Grove
- $40kRbw- internal alt to single storey dwg to include new tiled bath in place of laundry, new tiled toilet & bath, renovation to kitchen, & new bdrm 4 in place of dining. Removal of i 21 Rountree Place, Conifer Grove
87 consents
- Alterations and additions$196k
Rbw - add to an existing dwg & minor dwg including new roof, walls, windows & private drainage. Retaining wall.
- Alterations and additions$19k
Rbw - bathrm refurbishment in basement level of existing dwg.
- New homes$99k
Rbw - removal of internal wing wall between the dining & family rooms, replaced with a new beam. Construction of a new single-storey minor dwg consisting of one bdrm & one bathrm. Includ
- Pools and spas$5,000
Pool fence for exempt pool.
- Alterations and additions$80k
Rbw - new ensuite & wc to be constructed within existing hallway. Bdrm 3 divided into two separate rooms (new study). Removal of selected windows. Remove existing hardiplank cladding & replace wi
- Fires and heating$6,512
Replacing old woodfire with brand new masport Kaituna.
- Alterations and additions$40k
Rbw- internal alt to single storey dwg to include new tiled bath in place of laundry, new tiled toilet & bath, renovation to kitchen, & new bdrm 4 in place of dining. Removal of i
- Alterations and additions$60k
Rbw - internal alterations to include: install new wc in bathrm, move back door out, remove internal walls, mover front entrance & create new entry lobby. Install new door to rear of gge.
- Alterations and additions$2,500
Drill holes both through the interior lining, inject water repellent cosywall insulation & repair the holes. External gge walls only.
- Fires and heating$7,000
Sfh fixed fee: installation of a solid fuel heater to manufacturers specifications metro smart insert replaces existing fire
- Alterations and additions$15k
Rbw - existing bathrm renovation, changing the existing shower tray to tiled shower. Existing cavity slider replaced with a larger cavity slider.
- Alterations and additions$360k
Additions/alterations - extension to existing dwg including internal alterations
- Garages, sheds and carports$25k
Rbw - add/alt - study converted to ensuite for bdrm 4. Gge converted to rumpus.
- Repairs, recladding and strengthening$5,000
Rbw - reclad -patial reclad to existing two-storey dwg (ground level two walls on south west corner & one gable roof wall) with new cavity fixed horizontal linea weatherboard & new joinery un
- Commercial alterations$50k
Rbw - internal alterations to include altered entry. New study, bathrm in home office, bar sink in upper level & hwc.
- Fires and heating$7,600
Replacement of old woodfire with metro xtreme woody.
- Alterations and additions$95k
Rbw - alt & add to an existing two-storey dwg, including new bdrm with ensuite, new kitchen, new gge doors & joinery at the ground floor only.
- Alterations and additions$28k
Rbw - reconfigure existing bathrm to allow installation of a level access shower & new accessible vanity.
- New homes$331k
Rbw - 1. Existing dwg alternation: dbl gge changes to 1 bdrm, 1 ensuite & rumpus. 2. Proposed new one level second dwelling: 3 beds, 2 bath, ldy, living, dining, kitchen
- Alterations and additions$300k
Rbw - proposed two-storey extension to existing house, including three bedrooms, one study, three bathrooms, living, & a wc.
- Alterations and additions$90k
Rbw - alterations to existing dwg.
- Alterations and additions$150k
Rbw - add & alt to ground floor of dbl storey dwg - add of new lounge room & an extended family room area, new joinery to downstairs bdrm 4, renovated ground floor bath
- New homes$594k
Rbw - main - construction of a new three bdrm home with internal entry gge. Minor - construction of a new one bdrm home. Constructed with brick, linea & metal tile roofing.
- Retaining walls$40k
Rbw - alt to existing dwg & add of site retaining walls. Alt consists of some existing walls being removed & few wall openings being filled. It also includes the add o
- Alterations and additions$80k
Rbw- internal alt to single storey dwg- update kitchen & bathrooms, minor internal alterations to accommodate new layouts.
ResidentialCommercial The dots are this page of the list.
Suburbs in Takanini
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Takanini?
In the year to September 2026, Stats NZ counted 17,131 new homes consented in the Auckland council area, with $8.53b of residential and $3.37b of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.