Building consents · Stats NZ figures to September 2026
Building consents in Tangiteroria
124 new homes were consented in the Kaipara District council area in the year to September 2026, up 6% on the year before. They also consented $40.8m of non-residential building work, up 45% on the year before. Below: 13 consents we hold in Tangiteroria, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Kaipara District council area.
New homes consented each month
Dwellings in new building consents, Kaipara District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 267 in 2016.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Kaipara District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$11.9m
2 buildings · 1,200 m² new floor area · $9,583/m² new
- Education$10.9m
6 buildings · 1,315 m² new floor area · $5,798/m² new · +514% on the year before
- Shops, restaurants and bars$7m
1 building · 172 m² new floor area · $3,285/m² new · +29% on the year before
- Farm buildings$5.8m
29 buildings · 18,488 m² new floor area · $312/m² new · +50% on the year before
- Social, cultural and religious$2.4m
+26% on the year before
- Factories and industrial$1.5m
1 building · 94 m² new floor area · $15,957/m² new · −81% on the year before
- Warehouses and storage$746k
−74% on the year before
- Hotels and motels$350k
2 buildings · 155 m² new floor area · $1,935/m² new · −78% on the year before
- Offices$130k
−95% on the year before
Consents on record in Tangiteroria
Individual building consents we hold, each on its property: 13 from 1 Nov 2019 to 1 Aug 2024. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating3
typically $6,000
- Relocated buildings3
typically $70k
- New homes2
typically $573k
- Commercial alterations1
typically $90k
- Garages, sheds and carports1
typically $200k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
13 consents
- Commercial alterations$90k
New 12x9m skyline gge/ workshop with bathrm
- Fires and heating$5,000
Removal of old woodburner & hearth & replace new metro tiny rad woody & metro flu kit. New dektite & flashing
- Fires and heating$6,000
Decommision & removal of old fireplace & flu, disconnect existing weback replace with new metro wee rad woody, with new wet back kit replace with standard flu kit & new dektite & flashing 1070x1080 hearth made of concrete with pebble
- Relocated buildings$3,500
Second hand relocatable dwg - small extension, foundations & drainage onsite ww amendment 1: add of kent Murchison solid fuel heater, extra pile, reduce bearer size
- Fires and heating$6,500
Replacement fire metro xtreme rad leg solid fuel wood burner
- New homes$845k
4 bdrm new dwg. Onsite ww
- Relocated buildings$70k
2nd hand relocatable four bdrm dwg. Onsite ww
- Relocated buildings$100k
Second hand relocatable dwg - small extension, foundations & drainage onsite ww
- New homes$300k
New 3 bdrm, 2 bathrm, single storey dwg
- Garages, sheds and carports$200k
Alt to existing house- new timber decks, new internal gge, new bathrooms, new external joinery, internal alterations - private ww
- Relocated buildings$75k
Second hand relocatable 3 bdrm dwg - foundations & drainage private ww
- Alterations and additions$12k
Install wagener fairburn with wetback
- Plumbing, drainage and wastewater$20k
New septic system
ResidentialCommercial The dots are this page of the list.
Suburbs in Tangiteroria
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Tangiteroria?
In the year to September 2026, Stats NZ counted 124 new homes consented in the Kaipara District council area, with $95.9m of residential and $40.8m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.