Building consents · Stats NZ figures to September 2026
Building consents in Tauhara
313 new homes were consented in the Taupo District council area in the year to September 2026, down 9% on the year before. They also consented $77.9m of non-residential building work, up 3% on the year before. In Tauhara itself, 8 new homes were consented in the same year. Below: 71 consents we hold in Tauhara, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Taupo District council area, and new homes down to statistical areas, which is how Tauhara’s own count is made.
New homes consented each month
Dwellings in new building consents, Taupo District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 437 in 2004.
New homes in Tauhara
Stats NZ’s new dwellings for the statistical area that make up most of it: Tauhara. In the year to September 2026: 7 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Taupo District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Shops, restaurants and bars$28.2m
2 buildings · 10,287 m² new floor area · $1,968/m² new · +192% on the year before
- Farm buildings$9.3m
38 buildings · 16,952 m² new floor area · $536/m² new · +146% on the year before
- Hospitals and health$8.4m
2 buildings · 1,348 m² new floor area · $6,102/m² new · +319% on the year before
- Factories and industrial$7.4m
4 buildings · 2,502 m² new floor area · $2,838/m² new · +66% on the year before
- Education$6.7m
3 buildings · 647 m² new floor area · $4,490/m² new · −64% on the year before
- Hostels, boarding houses and prisons$5.1m
2 buildings · 458 m² new floor area · $10,262/m² new
- Offices$4.1m
3 buildings · 132 m² new floor area · $3,598/m² new · −24% on the year before
- Hotels and motels$3.9m
15 buildings · 837 m² new floor area · $4,007/m² new · −70% on the year before
- Social, cultural and religious$3m
4 buildings · 705 m² new floor area · $3,262/m² new · −62% on the year before
- Warehouses and storage$1.7m
4 buildings · 1,774 m² new floor area · $719/m² new · −85% on the year before
Consents on record in Tauhara
Individual building consents we hold, each on its property: 71 from 1 Jul 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions12
3 in the last 12 months · typically $20k
- Fires and heating12
2 in the last 12 months · typically $6,000
- New homes5
1 in the last 12 months · typically $470k
- Multiple homes3
1 in the last 12 months · typically $1.6m
- Garages, sheds and carports2
1 in the last 12 months · typically $20k
- Decks, pergolas and verandahs2
typically $63k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $10k
- Pools and spas1
typically $10k
- Retaining walls1
typically $12k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.6mRbw - six terraced res dwgs each with two bedrooms & two bathrooms. On-site wastewater system & on-site storm water tank. 22 Cumberland Street
- $550kDwg with attached gge 43A Elizabeth Street
- $100kIntertenancy wall added to separate house into two units. 172 Taharepa Road
- $30kNew ensuite & wir in existing converted gge, 253 Taharepa Road
- $20kRemoval of the existing wall between the kitchen & living 10 Terence Street
71 consents
- Plumbing, drainage and wastewater$10k
New water connection, new wastewater (existing house to be
- Alterations and additions$20k
Removal of the existing wall between the kitchen & living
- Fires and heating$9,000
Installation of a new woodsman Brunner mkii wetbacked
- Fires and heating$6,068
A metro smart insert woodburner (masonry) to be installed. A
- Garages, sheds and carports$30k
New ensuite & wir in existing converted gge,
- Alterations and additions$2,800
R2 - minor works - replace acrylic shower with tiled shower & floor.
- New homes$550k
Dwg with attached gge
- Alterations and additions$100k
Intertenancy wall added to separate house into two units.
- Multiple homes$1.6m
Rbw - six terraced res dwgs each with two bedrooms & two bathrooms. On-site wastewater system & on-site storm water tank.
- New homes$400k
2 x single level 3 bed dwgs with board & batten
- Multiple homes$2m
Construction of 9 attached dwgs in 4 buildings, subject to section 67 & section 77 notice
- Alterations and additions$20k
Rbw bathrm alt incl. Wet floor
- Garages, sheds and carports$10k
Proposed laundry extension &gge removal to the nyahore
- Alterations and additions$10k
Reinstatement of fire-damaged cladding & soffits
- Pools and spas$10k
Construct a barrier for a swimming pool under 35,000 litres.
- New homes$945k
Rbw -new two-storey dwg, including 7 bedrooms, 5 bathrooms, 1 wc, living, dining, kitchen, gge & private drainage
- Fires and heating$5,203
Installation of new metro tiny ultra rad freestanding wood
- Alterations and additions$25k
New downstairs bathrm
- Fires and heating$8,429
Installation of new pyro classic freestanding wood fire.
- Alterations and additions$12k
Installation of new rika revo ii freestanding pelletfire. A
- Alterations and additions$200k
Amendment - change of roof & wall cladding floor joists
- Alterations and additions$5,000
Remove alcove from side of house incorporating area into
- Alterations and additions$30k
Alterations to bathrm area.
- Fires and heating$5,000
Installation of a metro wee rad woody eco woodburner. A
- Multiple homes$800k
Construction of two res dwgs divided by a
ResidentialCommercial The dots are this page of the list.
Near Tauhara
Questions
How many building consents were issued in Tauhara?
In the year to September 2026, Stats NZ counted 313 new homes consented in the Taupo District council area, with $225m of residential and $77.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.