Building consents in Welcome Bay
798 new homes were consented in the Tauranga City council area in the year to September 2026, up 80% on the year before. They also consented $243m of non-residential building work, down 13% on the year before. In Welcome Bay itself, 24 new homes were consented in the same year. Below: 295 consents we hold in Welcome Bay, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Tauranga City council area, and new homes down to statistical areas, which is how Welcome Bay’s own count is made.
New homes consented each month
Dwellings in new building consents, Tauranga City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 1,998 in 1997.
New homes in Welcome Bay
Stats NZ’s new dwellings for the 4 statistical areas that make up most of it: Welcome Bay South, Kaitemako, Welcome Bay West, Welcome Bay East. In the year to September 2026: 11 houses, 13 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Tauranga City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$79.7m
9 buildings · 29,100 m² new floor area · $2,184/m² new · +171% on the year before
- Social, cultural and religious$44.6m
7 buildings · 5,182 m² new floor area · $7,333/m² new · −41% on the year before
- Shops, restaurants and bars$40.8m
8 buildings · 12,089 m² new floor area · $2,271/m² new · +61% on the year before
- Education$25.9m
13 buildings · 3,593 m² new floor area · $4,698/m² new · −41% on the year before
- Warehouses and storage$23.8m
8 buildings · 12,115 m² new floor area · $1,826/m² new · −29% on the year before
- Factories and industrial$20.6m
2 buildings · 4,600 m² new floor area · $3,946/m² new · −57% on the year before
- Hospitals and health$5.8m
2 buildings · 260 m² new floor area · $4,385/m² new · −73% on the year before
- Hostels, boarding houses and prisons$1.8m
1 building · 107 m² new floor area · $4,256/m² new
- Farm buildings$212k
2 buildings · 276 m² new floor area · $768/m² new · −36% on the year before
- Hotels and motels$135k
−96% on the year before
Consents on record in Welcome Bay
Individual building consents we hold, each on its property: 295 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes42
16 in the last 12 months · typically $565k
- Fires and heating39
6 in the last 12 months · typically $6,000
- Alterations and additions38
6 in the last 12 months · typically $40k
- Repairs, recladding and strengthening12
3 in the last 12 months · typically $200k
- Pools and spas11
1 in the last 12 months · typically $10k
- Garages, sheds and carports9
1 in the last 12 months · typically $50k
- Decks, pergolas and verandahs8
1 in the last 12 months · typically $84k
- Retaining walls8
typically $33k
- Relocated buildings4
2 in the last 12 months · typically $16k
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $15k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.5m1 x 4-bdrm dwg 1 x 3-bdrm dwg x2 (duplex) 1 x 2-bdrm dwg x2 (duplex) 1 x 5-bdrm dwg retaining walls 9 Pennington Place
- $1.6mConstruct 1x two level four bdrm dwg with attached single gge & 2x two level three bdrm dwgs with attached single garages levels - site retaining & fire walls. Barrier to retaining wall/bc310760 needs to be completed before cc 26 Orion Drive
- $1.2mConstruct a two-level four bdrm dwg with attached dbl gge with one-bdrm unit above. Install two freestanding wagener sparky ca solid fuel heaters. 36 Falcon Drive
- $720kConstruct two storey four bdrm dwg with attached dbl gge. On-site sed storm water disposal system. 2 Mondo Way
- $607kErect a single-level three-bdrm dwg with attached dbl gge & retaining walls. 144 Waikite Road
295 consents
- New homes$1.6m
Construct 1x two level four bdrm dwg with attached single gge & 2x two level three bdrm dwgs with attached single garages levels - site retaining & fire walls. Barrier to retaining wall/bc310760 needs to be completed before cc
- Repairs, recladding and strengthening$125k
Alterations to dwg. Partial reclad & reroof to remediate areas of roof & walls affected by storm as indicated on plans
- Plumbing, drainage and wastewater$15k
Installation of new septic system
- New homes$550k
Construct two level three bdrm dwg.
- Repairs, recladding and strengthening$350k
Alterations to dwg - repair roof of damaged dwg replace linings within bdrm & living room. Partial reclad.
- Relocated buildings$19k
Alterations to dwg - laundry relocated to ground floor gge. Gge converted to office, laundry, bathrm & store.
- New homes$425k
Single storey 2-bdrm dwg with attached gge
- Garages, sheds and carports$400k
Construct a shed with bathrm & mezzanine floor with retaining walls & balustrade
- New homes$425k
Construct single storey dwg three bdrm with attached dbl gge & retaining walls
- New homes$456k
Construct single storey three bdrm dwg with attached dbl gge & retaining walls
- Alterations and additions$9,000
Change of use. From single household unit to two separate household units. Upgrading existing firewall to compliant fire acoustic wall. Including soffit area between.
- New homes$720k
Construct two storey four bdrm dwg with attached dbl gge. On-site sed storm water disposal system.
- Fires and heating$3,000
Installation of a new metro wee rad woody solid fuel heater & new flue system
- Alterations and additions$6,500
Installation of a new maxen kinmont 350w freestanding soild fuel heater & new flue kit
- New homes$457k
Single storey 3 bdrm domestic dwg with attached gge
- New homes$448k
Single storey 3-bdrm domestic dwg with attached gge
- New homes$387k
Construction of new two storey res dwg as part
- Alterations and additions$50k
Alterations to dwg: remove loadbearing wall & replace with beam. Relocate wc. Reconfigure bathrm (add shower). Relocate laundry. Reconfigure kitchen/dining/living & media area.
- Fires and heating$8,000
Installation of freestanding masport clutha solid fuel heater.
- New homes$457k
3-bdrm dwg
- Multiple homes$2.5m
1 x 4-bdrm dwg 1 x 3-bdrm dwg x2 (duplex) 1 x 2-bdrm dwg x2 (duplex) 1 x 5-bdrm dwg retaining walls
- New homes$607k
Erect a single-level three-bdrm dwg with attached dbl gge & retaining walls.
- Fires and heating$7,500
Installation of a replacement insert masport Rangitata solid fuel heater.
- Alterations and additions$25k
Add & alterations to existing dwg extend existing upper floor living room into existing deck. Add bathrm to ground floor
- Fires and heating$5,000
Installation of an insert woodsman Totara solid fuel heater.
ResidentialCommercial The dots are this page of the list.
Near Welcome Bay
Questions
How many building consents were issued in Welcome Bay?
In the year to September 2026, Stats NZ counted 798 new homes consented in the Tauranga City council area, with $453m of residential and $243m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.