Building consents · Stats NZ figures to September 2026
Building consents in Tikokino
36 new homes were consented in the Central Hawke's Bay District council area in the year to September 2026, down 22% on the year before. They also consented $9m of non-residential building work, down 4% on the year before. Below: 20 consents we hold in Tikokino, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Central Hawke's Bay District council area.
New homes consented each month
Dwellings in new building consents, Central Hawke's Bay District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 112 in 2021.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Central Hawke's Bay District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Farm buildings$3.8m
21 buildings · 4,963 m² new floor area · $765/m² new · +125% on the year before
- Education$1.9m
1 building · 126 m² new floor area · $4,365/m² new · +50% on the year before
- Factories and industrial$1.6m
3 buildings · 758 m² new floor area · $1,686/m² new · +62% on the year before
- Shops, restaurants and bars$665k
+56% on the year before
- Social, cultural and religious$645k
1 building · 79 m² new floor area · $2,532/m² new · −76% on the year before
- Hospitals and health$150k
- Warehouses and storage$135k
1 building · 50 m² new floor area · $1,900/m² new · +1700% on the year before
- Hostels, boarding houses and prisons$80k
1 building · 90 m² new floor area · $889/m² new · −96% on the year before
Consents on record in Tikokino
Individual building consents we hold, each on its property: 20 from 1 Sep 2021 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Fires and heating5
4 in the last 12 months · typically $5,000
- Alterations and additions4
3 in the last 12 months · typically $25k
- Repairs, recladding and strengthening2
1 in the last 12 months · typically $72k
- Relocated buildings2
typically $120k
- New homes2
typically $450k
- Commercial alterations1
1 in the last 12 months · typically $40k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $55k
- Multiple homes1
typically $7m
- Decks, pergolas and verandahs1
typically $15k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $98kR2 - add & alt to 1 storey detached dwg - repile, new extension & internal reconfiguration. Window changes. 55 Owen Street, Tikokino
- $55kC1 - alterations to lower unit including new window, beams & plumbing configuration 65 Mantell Street, Tikokino
- $40kDwg extensions 32 Phillips Street, Tikokino
- $40kGreenbuilt homes factory stock three bdrm Totara house 8 Sedgwick Street, Tikokino
- $10kServices to supplementary container housing - detached 214A Makaroro Road, Tikokino
20 consents
- Fires and heating$5,000
Install metro xtreme rad legs wood burner & new flue kit.
- Fires and heating$7,500
Installation of a metro mega rad leg freestanding solid fuel
- Commercial alterations$40k
Greenbuilt homes factory stock three bdrm Totara house
- Fires and heating$7,000
Install & replace metro wee rad ca freestanding fireplace.
- Alterations and additions$8,000
Install an firenzo lady kitchener platform base
- Fires and heating$2,000
Install freestanding wood burner
- Plumbing, drainage and wastewater$55k
C1 - alterations to lower unit including new window, beams & plumbing configuration
- Alterations and additions$10k
Services to supplementary container housing - detached
- Alterations and additions$40k
Dwg extensions
- Repairs, recladding and strengthening$98k
R2 - add & alt to 1 storey detached dwg - repile, new extension & internal reconfiguration. Window changes.
- Multiple homes$7m
New three level apartment building & associated carparking
- Decks, pergolas and verandahs$15k
New pergola attached to house housing - detached
- Fires and heating$5,000
Install metro wee rad leg free standing fire
- New homes$300k
New transportable dwg housing - detached
- New homes$600k
New dwg with basement gge
- Alterations and additions$206k
New outbuilding
- Relocated buildings$120k
Relocate dwg & relocate gge housing - detached
- Repairs, recladding and strengthening$45k
Repile an existing dwg housing - detached
- Relocated buildings$120k
Relocate 2nd hand dwg on to new timber piles with housing - detached
- Relocated buildings$50k
Relocate dwg housing - detached
ResidentialCommercial The dots are this page of the list.
Suburbs in Tikokino
Where the consents we hold are, most in the last 12 months first.
Questions
How many building consents were issued in Tikokino?
In the year to September 2026, Stats NZ counted 36 new homes consented in the Central Hawke's Bay District council area, with $27.3m of residential and $9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.