Building consents · Stats NZ figures to September 2026
Building consents in Seacliff
501 new homes were consented in the Dunedin City council area in the year to September 2026, up 7% on the year before. They also consented $135m of non-residential building work, down 49% on the year before. In the statistical area around Seacliff, 6 new homes were consented in the same year. Below: 12 consents we hold in Seacliff, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Dunedin City council area, and new homes down to statistical areas, which is how Seacliff’s own count is made.
New homes consented each month
Dwellings in new building consents, Dunedin City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 548 in 2021.
New homes in Seacliff
Stats NZ’s new dwellings for the statistical area Seacliff sits in (Bucklands Crossing) — the suburb is smaller than one. In the year to September 2026: 4 houses, 2 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Dunedin City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$36.8m
4 buildings · 2,575 m² new floor area · $11,379/m² new · −79% on the year before
- Education$26.7m
5 buildings · 1,648 m² new floor area · $4,333/m² new · −10% on the year before
- Offices$19m
3 buildings · 994 m² new floor area · $4,863/m² new · +47% on the year before
- Factories and industrial$17.2m
6 buildings · 3,608 m² new floor area · $3,160/m² new · +41% on the year before
- Hostels, boarding houses and prisons$12.8m
1 building · 504 m² new floor area · $655/m² new · +551% on the year before
- Shops, restaurants and bars$9.4m
2 buildings · 1,169 m² new floor area · $2,737/m² new · +12% on the year before
- Social, cultural and religious$6.5m
3 buildings · 1,404 m² new floor area · $605/m² new · −56% on the year before
- Farm buildings$2.5m
24 buildings · 4,194 m² new floor area · $556/m² new · −9% on the year before
- Warehouses and storage$2.4m
2 buildings · 1,758 m² new floor area · $813/m² new · −35% on the year before
- Hotels and motels$1.9m
−35% on the year before
Consents on record in Seacliff
Individual building consents we hold, each on its property: 12 from 1 Dec 2016 to 1 Jan 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions2
typically $236k
- Minor dwellings and sleepouts1
1 in the last 12 months · typically $45k
- Decks, pergolas and verandahs1
typically $10k
- Fires and heating1
typically $10k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $45kExtend sleepout to enlarge bdrm, form ensuite 18 Kilgour Street
12 consents
- Minor dwellings and sleepouts$45k
Extend sleepout to enlarge bdrm, form ensuite
- Alterations and additions$200k
Alt layout of dwg - remove walls, install beams, wet floor shower & metro rad plus heater
- Fires and heating$10k
Instal woodsman rmf multifuel fire (replacement)
- Decks, pergolas and verandahs$10k
Amendment to aba-2021-2955 - enclose back-door deck, revise level three bracing, change layout of bdrm one ensuite, toilet & dresser, delete hand basin from toilet
- Alterations and additions$271k
Exemption - install a new proprietary pre stressed concrete bridge to replace the deteriorated existing structure
- New homes$600k
Erect Dwelling with Bosca Spirit 550 Heater, Erect Garage with Laundry and Toilet
- Fires and heating$3,300
Install woodsman Brunner ii heater in dwg
- New homes$90k
Convert Church to Dwelling & Install Masport McKenzie Heater
- Fires and heating$5,000
Install ravelli rosa r70 freestanding pellet fire in dwg
- Alterations and additions$20k
Alt dwg - remove post & install beam, install french doors & window in kitchen
- Minor dwellings and sleepouts$120k
Erect Granny Flat with Kitchen, Bathroom and Office
- New homes$950k
Erect Dwelling with Attached Garage, Install Domestic Fire Sprinkler System, Septic Tank and Effluent Field, Rainwater Tank and 3 Woodburners (Storax Riva Studio2, Jetmaster Quadro, Mega LTD Rad)
ResidentialCommercial The dots are this page of the list.
Near Seacliff
Questions
How many building consents were issued in Seacliff?
In the year to September 2026, Stats NZ counted 501 new homes consented in the Dunedin City council area, with $256m of residential and $135m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.