Building consents · Stats NZ figures to September 2026

Commercial building consents in Waipapa

Councils consented $60.7m of non-residential building work in the Far North District council area in the year to September 2026, about level with the year before. Below: 265 commercial consents we hold in Waipapa, searchable and on the map.

Non-residential work$60.7m0% new and altered
New floor area18,753 m²$1,877/m² to build
Consents we hold26524 in the last 12 monthsSearch them ↓

Stats NZ publishes building consents down to the council, so the official figures on this page are for the Far North District council area.

Non-residential building work each month

The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Far North District, the last five years.

$0$10m$20m$30m20222023202420252026October 2021: $2.8mNovember 2021: $2.4mDecember 2021: $2.7mJanuary 2022: $635kFebruary 2022: $9mMarch 2022: $5.9mApril 2022: $7.6mMay 2022: $2.9mJune 2022: $12.7mJuly 2022: $18.5mAugust 2022: $18mSeptember 2022: $3mOctober 2022: $16.3mNovember 2022: $1.7mDecember 2022: $4.3mJanuary 2023: $2.5mFebruary 2023: $9.2mMarch 2023: $22.2mApril 2023: $1.1mMay 2023: $2.4mJune 2023: $4.9mJuly 2023: $2.5mAugust 2023: $3mSeptember 2023: $5.4mOctober 2023: $4.8mNovember 2023: $5.8mDecember 2023: $1.1mJanuary 2024: $2.5mFebruary 2024: $3.7mMarch 2024: $5.4mApril 2024: $2.7mMay 2024: $18.2mJune 2024: $2.4mJuly 2024: $3.4mAugust 2024: $21.3mSeptember 2024: $4.6mOctober 2024: $5.8mNovember 2024: $6.4mDecember 2024: $800kJanuary 2025: $1.6mFebruary 2025: $4.7mMarch 2025: $5.5mApril 2025: $4.4mMay 2025: $2.2mJune 2025: $10.6mJuly 2025: $4mAugust 2025: $8.3mSeptember 2025: $6.1mOctober 2025: $4.8mNovember 2025: $9.3mDecember 2025: $10.8mJanuary 2026: $1.9mFebruary 2026: $6mMarch 2026: $3.6mApril 2026: $5.2mMay 2026: $3.3mJune 2026: $1.3mJuly 2026: $8.4mAugust 2026: $3.7mSeptember 2026: $2.4m

What is being built

Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.

  1. Education$11.9m

    3 buildings · 471 m² new floor area · $4,246/m² new · −13% on the year before

  2. Hospitals and health$10.7m

    4 buildings · 1,584 m² new floor area · $4,962/m² new · +25% on the year before

  3. Social, cultural and religious$9m

    7 buildings · 1,458 m² new floor area · $3,575/m² new · −28% on the year before

  4. Factories and industrial$7m

    8 buildings · 3,705 m² new floor area · $1,421/m² new · −31% on the year before

  5. Hotels and motels$5.4m

    2 buildings · 674 m² new floor area · $6,306/m² new · +1368% on the year before

  6. Offices$5m

    2 buildings · 1,427 m² new floor area · $1,367/m² new · +111% on the year before

  7. Farm buildings$4.6m

    31 buildings · 6,328 m² new floor area · $645/m² new · +40% on the year before

  8. Warehouses and storage$4.2m

    6 buildings · 2,980 m² new floor area · $1,418/m² new · +227% on the year before

  9. Shops, restaurants and bars$2.9m

    1 building · 126 m² new floor area · $2,778/m² new · −65% on the year before

Non-residential work since 1991

The value consented each year, in the dollars of the day (not adjusted for inflation).

$0$50m$100m$150m19952000200520102015202020251991: $4.3m1992: $10.5m1993: $19m1994: $16.9m1995: $16.7m1996: $19.2m1997: $16.9m1998: $12.3m1999: $21m2000: $16.3m2001: $22.1m2002: $30.6m2003: $83.1m2004: $31.6m2005: $32.5m2006: $55.9m2007: $47.3m2008: $109m2009: $46m2010: $50.7m2011: $19.3m2012: $19.9m2013: $19.6m2014: $25.9m2015: $38.7m2016: $28.1m2017: $41.2m2018: $83m2019: $48.8m2020: $32.2m2021: $54.2m2022: $100m2023: $64.9m2024: $77.2m2025: $72.4m2026 (to Sep 2026): $35.8m

Commercial consents on record in Waipapa

Individual building consents we hold, each on its property: 265 from 28 Jan 2000 to 6 Nov 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Commercial alterations55

    24 in the last 12 months · typically $45k

  2. Fit-outs5

    typically $30k

  3. New commercial buildings3
  4. Relocated buildings2
  5. Farm buildings1

Consents on record by month

The last three years. A recent dip is often records still to arrive.

0246202420252026December 2023: 0January 2024: 0February 2024: 0March 2024: 1April 2024: 0May 2024: 1June 2024: 1July 2024: 1August 2024: 0September 2024: 1October 2024: 0November 2024: 0December 2024: 0January 2025: 2February 2025: 1March 2025: 2April 2025: 0May 2025: 1June 2025: 0July 2025: 3August 2025: 1September 2025: 1October 2025: 3November 2025: 3December 2025: 0January 2026: 0February 2026: 0March 2026: 0April 2026: 5May 2026: 3June 2026: 6July 2026: 3August 2026: 2September 2026: 2October 2026: 1November 2026: 1

265 consents

  1. Commercial alterations

    Spec 16 dwelling to be constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing

    2077 State Highway 10, Waipapa · 6 Nov 2026 · EBC-2027-408/0

  2. Commercial alterations

    Three new detached single-storey retail buildings

    20 Klinac Lane, Waipapa · 20 Oct 2026 · EBC-2026-1042/0

  3. Commercial alterations

    Parirau Marae Ablution Block - Prefabricated single storey ablution block to be constructed in Advance Build Factory and transported to site on a separate consent outside of the district. Ablution block designed tovery high wind zone. excl water temp test & plumbed fixtures leak test

    2077 State Highway 10, Waipapa · 27 Sep 2026 · EBC-2027-205/0

  4. Commercial alterations

    Dwelling - Prefabricated dwelling constructed in Advance Build Factory in Waipapa and transported to site once we have applied for amendment when all the site information has been received

    2077 State Highway 10, Waipapa · 15 Sep 2026 · EBC-2027-191/0

  5. Commercial alterations

    Add bathroom & new joinery to create workshop/storage room

    49 Caprine Road, Waipapa · 31 Aug 2026 · EBC-2027-150/0

  6. Commercial alterations

    dwelling to be constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 4 Aug 2026 · EBC-2027-76/0

  7. Commercial alterations

    dwelling to be constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Extra High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 16 Jul 2026 · EBC-2026-1105/0

  8. Commercial alterations

    Waikara Marae Ablution Block - Prefabricated single storey ablution block to be constructed in Advance Build Factory and transported to site on a separate consent outside of the district. Ablution block designed to very high wind zone. excl water temp test & plumbed fixtures leak test

    2077 State Highway 10, Waipapa · 13 Jul 2026 · EBC-2026-1090/0

  9. Commercial alterations

    Renovations to existing commercial building with extension to create 8 units. Two new commercial buildings with 9 units total. Onsite wastewater treatment, stormwater drainage. Earthwork & retaining walls

    2056 State Highway 10, Waipapa · 1 Jul 2026 · EBC-2026-1104/0

  10. Commercial alterations

    House 7&8 (duplex) - Prefabricated Single storey duplex to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing

    2077 State Highway 10, Waipapa · 24 Jun 2026 · EBC-2026-1080/0

  11. Commercial alterations

    House 3 - 2 bedroom dwelling constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 17 Jun 2026 · EBC-2026-1048/0

  12. Commercial alterations

    House 2 - 2 bedroom dwelling constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 16 Jun 2026 · EBC-2026-1047/0

  13. Commercial alterations

    House 4 - 2 bedroom dwelling constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 16 Jun 2026 · EBC-2026-1049/0

  14. Commercial alterations

    House 6 - Prefabricated 2 bedroom dwelling to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 4 Jun 2026 · EBC-2026-1003/0

  15. Commercial alterations

    Pouto Topu A, House 3 & 4 - Prefabricated Single storey duplex to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 4 Jun 2026 · EBC-2026-1004/0

  16. Commercial alterations

    Prefabricated 2 bedroom dwelling to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 29 May 2026 · EBC-2026-925/0

  17. Commercial alterations

    Prefabricated Single storey duplex to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 21 May 2026 · EBC-2026-924/0

  18. Commercial alterations

    Olive & Avocado Processing Shed - OLIVES NZ LTD Amendment to remove the accommodation / apartment shown on the original plans and BC.

    41 Sandys Road, Waipapa · 18 May 2026 · EBC-2000-1905/0/A

  19. Commercial alterations

    Dwelling - Prefab single storey to be constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 28 Apr 2026 · EBC-2026-832/0

  20. Commercial alterations

    Prefabricated Single storey to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone

    2077 State Highway 10, Waipapa · 23 Apr 2026 · EBC-2026-802/0

  21. Commercial alterations

    Prefabricated Single storey duplex to be Constructed in Advance Build factory and transported to site on separate consent Factory Dwelling designed to Very High Wind Zone

    2077 State Highway 10, Waipapa · 23 Apr 2026 · EBC-2026-803/0

  22. Commercial alterations

    Dwelling - Prefabricated Single storey to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing

    2077 State Highway 10, Waipapa · 20 Apr 2026 · EBC-2026-815/0

  23. Commercial alterations

    PIM Only - Three new detached single storey retail buildings

    20 Klinac Lane, Waipapa · 8 Apr 2026 · EBC-2026-800/0

  24. Commercial alterations

    Dwelling - Prefabricated Single storey to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 17 Nov 2025 · EBC-2026-411/0

  25. Commercial alterations

    Van Lune Dwelling - Prefabricated Single storey to be Constructed in Advance Build factory and transported to site on separate consent outside the district. Factory Dwelling designed to Very High Wind Zone. Excludes water temp testing and plumbing fixtures leak testing.

    2077 State Highway 10, Waipapa · 13 Nov 2025 · EBC-2026-410/0

ResidentialCommercial The dots are this page of the list.

Suburbs in Waipapa

Where the consents we hold are, most in the last 12 months first.

Questions

How many building consents were issued in Waipapa?

In the year to September 2026, Stats NZ counted 314 new homes consented in the Far North District council area, with $164m of residential and $60.7m of non-residential building work.

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.

Official figures: Stats NZ, Building consents issued, September 2026 release, licensed CC BY 4.0. Values are as declared on the consent, before GST, in the dollars of the day. Recent months are revised as late consents arrive. Council: Far North District Council.