Building consents · Stats NZ figures to September 2026

Commercial building consents in Cardrona

Councils consented $237m of non-residential building work in the Queenstown-Lakes District council area in the year to September 2026, up 91% on the year before. Below: 47 commercial consents we hold in Cardrona, searchable and on the map.

Non-residential work$237m+91% new and altered
New floor area47,376 m²$4,363/m² to build
Consents we hold472 in the last 12 monthsSearch them ↓

Stats NZ publishes building consents down to the council, so the official figures on this page are for the Queenstown-Lakes District council area.

Non-residential building work each month

The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Queenstown-Lakes District, the last five years.

$0$20m$40m$60m$80m20222023202420252026October 2021: $13.6mNovember 2021: $11.8mDecember 2021: $458kJanuary 2022: $9.5mFebruary 2022: $34.3mMarch 2022: $14.7mApril 2022: $9.5mMay 2022: $6.6mJune 2022: $29mJuly 2022: $4.4mAugust 2022: $1.7mSeptember 2022: $2.4mOctober 2022: $14mNovember 2022: $10.8mDecember 2022: $61mJanuary 2023: $9.5mFebruary 2023: $9.8mMarch 2023: $44.3mApril 2023: $9.7mMay 2023: $22.5mJune 2023: $6.2mJuly 2023: $21.1mAugust 2023: $21.5mSeptember 2023: $2mOctober 2023: $17.7mNovember 2023: $70mDecember 2023: $15.2mJanuary 2024: $2.4mFebruary 2024: $8.5mMarch 2024: $4.5mApril 2024: $7.1mMay 2024: $6.4mJune 2024: $10.7mJuly 2024: $10.5mAugust 2024: $4.4mSeptember 2024: $16mOctober 2024: $2.7mNovember 2024: $20.6mDecember 2024: $12.4mJanuary 2025: $3.4mFebruary 2025: $17.9mMarch 2025: $12.9mApril 2025: $15.2mMay 2025: $9.6mJune 2025: $8.9mJuly 2025: $5.8mAugust 2025: $8mSeptember 2025: $6.6mOctober 2025: $3.7mNovember 2025: $19.3mDecember 2025: $15.1mJanuary 2026: $4.6mFebruary 2026: $27.3mMarch 2026: $36.2mApril 2026: $51.4mMay 2026: $11.2mJune 2026: $24.4mJuly 2026: $30.5mAugust 2026: $9.5mSeptember 2026: $4m

What is being built

Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.

  1. Hotels and motels$82.4m

    8 buildings · 13,675 m² new floor area · $5,115/m² new · +88% on the year before

  2. Shops, restaurants and bars$57.1m

    15 buildings · 14,795 m² new floor area · $3,258/m² new · +61% on the year before

  3. Social, cultural and religious$25.9m

    7 buildings · 3,497 m² new floor area · $6,822/m² new · +268% on the year before

  4. Hostels, boarding houses and prisons$25.8m

    3 buildings · 6,050 m² new floor area · $4,264/m² new

  5. Offices$20.7m

    6 buildings · 2,766 m² new floor area · $5,998/m² new · +33% on the year before

  6. Education$12m

    5 buildings · 2,611 m² new floor area · $4,475/m² new · +391% on the year before

  7. Factories and industrial$7.2m

    5 buildings · 1,617 m² new floor area · $3,348/m² new · +310% on the year before

  8. Warehouses and storage$4.3m

    3 buildings · 1,774 m² new floor area · $2,430/m² new · +100% on the year before

  9. Farm buildings$892k

    3 buildings · 591 m² new floor area · $1,509/m² new · −75% on the year before

  10. Hospitals and health$800k

    −93% on the year before

Non-residential work since 1991

The value consented each year, in the dollars of the day (not adjusted for inflation).

$0$100m$200m$300m19952000200520102015202020251991: $8.3m1992: $6.1m1993: $18.2m1994: $54.5m1995: $58.4m1996: $24.2m1997: $30.5m1998: $19.8m1999: $29.2m2000: $38.8m2001: $41.2m2002: $35.4m2003: $54.3m2004: $74.2m2005: $61.7m2006: $89.9m2007: $111m2008: $101m2009: $77.4m2010: $38.4m2011: $32.8m2012: $43.3m2013: $24.1m2014: $95.4m2015: $115m2016: $117m2017: $166m2018: $165m2019: $231m2020: $288m2021: $153m2022: $198m2023: $250m2024: $106m2025: $126m2026 (to Sep 2026): $199m

Commercial consents on record in Cardrona

Individual building consents we hold, each on its property: 47 from 3 May 2016 to 23 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.

What the work is

Consents in the last five years by the kind of work their description names.

  1. Commercial alterations6

    2 in the last 12 months · typically $488k

  2. New commercial buildings4

    typically $625k

  3. Farm buildings1

    typically $150k

  4. Fit-outs1

    typically $7.3m

Consents on record by month

The last three years. A recent dip is often records still to arrive.

01122202420252026December 2023: 0January 2024: 1February 2024: 0March 2024: 0April 2024: 1May 2024: 1June 2024: 0July 2024: 0August 2024: 0September 2024: 0October 2024: 0November 2024: 1December 2024: 1January 2025: 0February 2025: 0March 2025: 2April 2025: 1May 2025: 0June 2025: 0July 2025: 0August 2025: 0September 2025: 0October 2025: 0November 2025: 0December 2025: 0January 2026: 0February 2026: 0March 2026: 1April 2026: 0May 2026: 0June 2026: 0July 2026: 1August 2026: 0September 2026: 0October 2026: 0November 2026: 0

Largest in the last 12 months

  1. $375kStage 1 of 2: Foundations & associated services sleeves (excluding the slab) for new commercial building (Soho Restaurant) 2090 Cardrona Valley Road
  2. $7,000Alteration to Cardrona Hotel: Retrofit Jetmaster 700D fireplace into existing fireplace in main room. 2312 Cardrona Valley Road

47 consents

  1. Commercial alterations$7,000

    Alteration to Cardrona Hotel: Retrofit Jetmaster 700D fireplace into existing fireplace in main room.

    2312 Cardrona Valley Road · 23 Jul 2026 · BC260930

  2. Commercial alterations$375k

    Stage 1 of 2: Foundations & associated services sleeves (excluding the slab) for new commercial building (Soho Restaurant)

    2090 Cardrona Valley Road · 31 Mar 2026 · BC260137

  3. New commercial buildings$3m

    Construction of two storey multi unit dwelling with attached garage

    5 White Star Road · 2 Apr 2025 · BC241443

  4. New commercial buildings$80k

    Construction of detached outbuilding

    2090 Cardrona Valley Road · 25 Mar 2025 · BC250129

  5. Fit-outs$7.3m

    Stage 3 of 3: Alteration to existing commercial building: Remaining works for two level retail & F&B building (precast façade panels, out of building footprint services, the envelope, fire report, fitout & services) (connected to existing ticket and retail building) (Stage 2 BC241244) Cardrona Alpine Resort_x000d_ Link structure specified intended life 25 years

    2090 Cardrona Valley Road · 5 Mar 2025 · BC241352

  6. Commercial alterations$1.4m

    Stage 2 of 3: Superstructure for two level retail and F&B building (Ground floor slab, structural steel and suspended midfloor) (Stage 1 BC241154)

    2090 Cardrona Valley Road · 17 Dec 2024 · BC241244

  7. Commercial alterations$600k

    Stage 1 of 3: Foundations and in foundation drainage only (for new retail and F&B building) - Cardrona Alpine Resort

    2090 Cardrona Valley Road · 7 Nov 2024 · BC241154

  8. Commercial alterations$179k

    Alteration to existing workshop - Workshop extension - Workshop 8, Cardrona Valley Road, Cardrona.

    · 8 May 2024 · BC240262

  9. Farm buildings$150k

    Construct farm shed with bathroom and wood burner. Install waste water disposal system - 1653 Cardrona Valley Road, Wanaka

    1653 Cardrona Valley Road · 4 Apr 2024 · BC240012

  10. New commercial buildings$570k

    Construction of ticket office and storage space - Snow Farm, 1655 Cardrona Valley Road

    · 30 Jan 2024 · BC231381

  11. Commercial alterations$7m

    Commercial building with reception, clubroom, gym & change rooms. Including Amendment.01: alteration to building consent.

    2 Lee Avenue · 3 May 2023 · BC221665

  12. New commercial buildings$680k

    Construction of new hut with 36 sleeping spaces - Musterer's Hut, Snow Farm, Cardrona Valley Road

    · 19 Nov 2021 · BC211437

  13. Commercial alterations$12k

    Alteration to existing commercial building: Convert storage room to bathroom/laundry. Addition of sink/kitchen in upstairs foyer. (2303 Cardrona Valley Road Wanaka)

    2303 Cardrona Valley Road · 3 Feb 2021 · BC201364

  14. New commercial buildings$500k

    Construction of a new waste water treatment plant building.

    · 9 Dec 2020 · BC201257

  15. Commercial alterations$5,000

    Alteration to building - Installation of Wagner Sparky CA, free standing, woodburner.

    2303 Cardrona Valley Road · 24 Jul 2020 · BC200763

  16. Relocated buildings$25k

    Construct sub floor piles foundation & establish the existing relocatable building, new deck and veranda structure.

    2319 Cardrona Valley Road · 30 Jun 2020 · BC200565

  17. Commercial alterations$500k

    Refurbishment of commercial buildings - new workshop, blockwork + bondor panel construction, new glazing, new small infill roof (Cardrona Base Building, Cardrona Alpine Ski Resort)

    2090 Cardrona Valley Road · 27 Jan 2020 · BC191630

  18. Commercial alterations$5,000

    44 degrees 51' 39.55 - 169 degrees 06' Northern boundary of Snow Farm 2/27 Cardrona Valley Road - Alteration to back country hut: Installation of Yunca Oscar Wood Burner ( free standing / dry)_x000d_ Subject to specified intended life of 20 years

    · 30 Apr 2019 · BC190133

  19. Fit-outs$1.4m

    Cardrona Base Building, Cardrona Alpine Resort 2090. Cardrona Valley Road. Construction of two new external doors. Internal fit out of existing cafe, mezzanine cafe and kitchen. Upgrade of existing cafe toilets. New Accessible toilets.

    2090 Cardrona Valley Road · 7 Feb 2019 · BC171590

  20. Commercial alterations$4.3m

    2090 Cardrona Valley Road (Base Buildings at Cardrona Alpine Ski Resort) - Construction of new arrival hall building, refurbishment of existing rental hall and construction of new express lane walkway_x000d_ AMENDMENT 1 - Additional service area constructed with relocated and altered shipping containers

    2090 Cardrona Valley Road · 13 Nov 2018 · BC181243

  21. Commercial alterations$60k

    Alteration to existing building - change the ground floor from a staff room and store room to provide two additional accommodation units.

    · 7 Sep 2018 · BC180765

  22. Commercial alterations$30k

    2312 Cardrona Valley Road Cardrona - Replacing Leaking Metal Roof

    2312 Cardrona Valley Road · 18 May 2018 · BC180351

  23. Commercial alterations$400k

    2090 Cardrona Valley Rd, Cardrona - Cardrona Base buildings - Re-roof buildings and re-route extractors

    2090 Cardrona Valley Road · 19 Apr 2018 · BC160185

  24. Commercial alterations$19k

    2348 Cardrona Valley Road - Erection of a relocatable 3 bed plus shop dwelling (built at the Genius Timaru Factory) and connection to services

    2348 Cardrona Valley Road · 15 Jan 2018 · BC171576

  25. Commercial alterations$300k

    2090 Cardrona Valley Road, Cardrona - Cardrona ski field base building - alterations and additions

    2090 Cardrona Valley Road · 17 May 2017 · BC170318

ResidentialCommercial The dots are this page of the list.

Near Cardrona

Questions

How many building consents were issued in Cardrona?

In the year to September 2026, Stats NZ counted 1,981 new homes consented in the Queenstown-Lakes District council area, with $1.22b of residential and $237m of non-residential building work.

What is a building consent?

Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.

Where do these figures come from?

The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.