Building consents · Stats NZ figures to September 2026
Building consents in Takapu Valley
824 new homes were consented in the Wellington City council area in the year to September 2026, up 66% on the year before. They also consented $377m of non-residential building work, down 45% on the year before. In the statistical area around Takapu Valley, 7 new homes were consented in the same year. Below: 23 consents we hold in Takapu Valley, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Wellington City council area, and new homes down to statistical areas, which is how Takapu Valley’s own count is made.
New homes consented each month
Dwellings in new building consents, Wellington City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 1,429 in 2019.
New homes in Takapu Valley
Stats NZ’s new dwellings for the statistical area Takapu Valley sits in (Takapu-Horokiwi) — the suburb is smaller than one. In the year to September 2026: 7 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Wellington City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$153m
8 buildings · 10,560 m² new floor area · $2,610/m² new · −55% on the year before
- Education$97.7m
9 buildings · 9,454 m² new floor area · $7,951/m² new · +174% on the year before
- Social, cultural and religious$48.9m
3 buildings · 511 m² new floor area · $27,789/m² new · −27% on the year before
- Hospitals and health$23.9m
1 building · −71% on the year before
- Hotels and motels$23.5m
+467% on the year before
- Shops, restaurants and bars$17.7m
1 building · 166 m² new floor area · $3,163/m² new · +60% on the year before
- Hostels, boarding houses and prisons$7.1m
+44% on the year before
- Factories and industrial$2.4m
1 building · −98% on the year before
- Warehouses and storage$2.1m
2 buildings · 545 m² new floor area · $1,734/m² new · +1488% on the year before
- Farm buildings$105k
1 building · 84 m² new floor area · $1,250/m² new · +5% on the year before
Consents on record in Takapu Valley
Individual building consents we hold, each on its property: 23 from 1 Aug 2019 to 1 Aug 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions9
1 in the last 12 months · typically $60k
- Fires and heating3
typically $5,000
- Repairs, recladding and strengthening1
1 in the last 12 months · typically $550k
- Garages, sheds and carports1
typically $45k
- Minor dwellings and sleepouts1
typically $400k
- Pools and spas1
typically $550k
- Commercial alterations1
typically $9,500
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $550kR2 - additon & alt to two-storey detached dwg. Ful re-clad & new joinery. New roof extension. New fireplace & flue system. New ceiling lining to bathrm & new flooring to ensuite. Additional bracing & new coating to gge. 33 Woodburn Drive
- $200kR3 - add & alt to existing three-storey detached dwg. 73 Woodburn Drive
23 consents
- Alterations and additions$200k
R3 - add & alt to existing three-storey detached dwg.
- Repairs, recladding and strengthening$550k
R2 - additon & alt to two-storey detached dwg. Ful re-clad & new joinery. New roof extension. New fireplace & flue system. New ceiling lining to bathrm & new flooring to ensuite. Additional bracing & new coating to gge.
- Alterations and additions$30k
R2 - alterations to existing two storey detached dwg. Renovations to two bathrooms.
- Alterations and additions$5,000
R2 - alt to 2 storey detached dwg - new window in kitchen.
- Fires and heating$5,000
R2 - alt to existing detached dwg - install new metro wee rad woody wood burner.
- Garages, sheds and carports$45k
R1 - new gge & carport.
- Alterations and additions$60k
R1 - MSE embankmment.
- Pools and spas$550k
R3 - extension, alt & new inground swimming pool to existing two storey detached dwg
- Alterations and additions$450k
R3 - alterations to existing detached dwg - rennovations to two storey home. Includes recladding.
- Commercial alterations$9,500
R1 - internal alt to existing workshop.
- Alterations and additions$60k
R3 - alt to existing three storey dwg. New ensuite, new bdrm & remodeling of existing bathrm
- Alterations and additions$65k
R1 - alt to detached dwg. New ensuite & window/door alt
- Fires and heating$6,800
R2 - quick - new freestanding masport wood burner.
- Alterations and additions$60k
R2 - alterations & additions to two storey detached dwg. Includes extended entrance.
- Alterations and additions$120k
R3 - replacement of cladding to dormers & new wet area membrane in two-storey detached dwg.
- Minor dwellings and sleepouts$400k
R1 - new studio.
- Fires and heating$4,000
R2 - quick - removal of existing wood burner & installation of new in-built athena bay flush.
- New homes$850k
R2 - new two storey dwg with attached gge
- Alterations and additions$235k
R2- add to two storey detached dwg. New bdrm, ensuite & closet.
- Alterations and additions$2,000
R1 - portal quick - installation of a freestanding firenzo Bronte woodburner into new penetrations
- New homes$600k
R1 - new one storey dwg with attached gge, ...
- Alterations and additions$90k
R2 - additions & alterations to existing two storey detached dwg. Add of bdrm, ensuite & deck to first floor. New central heating cooker on ground floor
- New homes$400k
R3- new two-storey dwg including three bedrooms, four bathrooms & attached dbl gge & firenzo fusion wetback woodburner
ResidentialCommercial The dots are this page of the list.
Near Takapu Valley
Questions
How many building consents were issued in Takapu Valley?
In the year to September 2026, Stats NZ counted 824 new homes consented in the Wellington City council area, with $394m of residential and $377m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.