Building consents · Stats NZ figures to September 2026
Building consents in Wanganui East
190 new homes were consented in the Whanganui District council area in the year to September 2026, up 40% on the year before. They also consented $72.5m of non-residential building work, down 27% on the year before. In Wanganui East itself, 5 new homes were consented in the same year. Below: 73 consents we hold in Wanganui East, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Whanganui District council area, and new homes down to statistical areas, which is how Wanganui East’s own count is made.
New homes consented each month
Dwellings in new building consents, Whanganui District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 199 in 2021.
New homes in Wanganui East
Stats NZ’s new dwellings for the 3 statistical areas that make up most of it: Whanganui East-Williams Domain, Whanganui East-Riverlands, Wembley Park. In the year to September 2026: 5 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Whanganui District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$29.5m
5 buildings · 2,618 m² new floor area · $10,680/m² new · −56% on the year before
- Factories and industrial$14.2m
5 buildings · 1,509 m² new floor area · $4,109/m² new · +385% on the year before
- Hostels, boarding houses and prisons$6m
+761% on the year before
- Social, cultural and religious$4m
2 buildings · 699 m² new floor area · $5,182/m² new · +44% on the year before
- Hospitals and health$3.9m
1 building · 540 m² new floor area · $7,070/m² new · +805% on the year before
- Shops, restaurants and bars$3.9m
1 building · 262 m² new floor area · $3,817/m² new · −62% on the year before
- Education$3.8m
2 buildings · 296 m² new floor area · $4,459/m² new · +215% on the year before
- Farm buildings$3.2m
20 buildings · 5,128 m² new floor area · $324/m² new · −11% on the year before
- Warehouses and storage$2.1m
2 buildings · 1,164 m² new floor area · $1,503/m² new · −78% on the year before
- Hotels and motels$2m
1 building · 422 m² new floor area · $4,739/m² new · +4344% on the year before
Consents on record in Wanganui East
Individual building consents we hold, each on its property: 73 from 1 Dec 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions21
5 in the last 12 months · typically $30k
- Fires and heating19
5 in the last 12 months · typically $7,000
- Garages, sheds and carports8
typically $43k
- New homes7
4 in the last 12 months · typically $430k
- Commercial alterations3
2 in the last 12 months · typically $100k
- Plumbing, drainage and wastewater3
1 in the last 12 months · typically $17k
- Pools and spas1
1 in the last 12 months · typically $180k
- Relocated buildings1
1 in the last 12 months · typically $50k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $990kRbw - prop. Add & alt of exist.Dwg. Prop. Extension of living, dining, kitchen area on new suspended concr. Slab, new internal areas including new bath, office & media, with new m 37 Hackett Street
- $430kConstruct a new res dwg with an attached gge 17A Falkland Street
- $430kConstruct a new res dwg with an attached gge 24 Millward Street
- $350kNew res dwg 20F Benefield Street
- $240kPim - standalone single dwg. Construction of a new small contained unit 156 Anzac Parade
73 consents
- Fires and heating$6,000
Install metro wee rad freestanding fire with eco flue in lounge
- Fires and heating$9,000
Installation of free standing evolution pellet fire, with flue going back into & up existing chimney, & flashing
- Alterations and additions$1,000
Alt.2 change of exterior cladding to vertical corrugated iron & relocation of a window on the gge (relocate gge.)
- Fires and heating$7,000
Install of a metro xtreme rad base fire into the living room including a new flue & roof flashing
- Commercial alterations$35k
Alt to existing commercial building - tilt panel wall remediation
- New homes$430k
Construct a new res dwg with an attached gge
- Plumbing, drainage and wastewater$3,000
Plumbing only consent. There is an existing septic tank system
- New homes$430k
Construct a new res dwg with an attached gge
- Pools and spas$180k
Insulation of a new narellan in ground fiberglass swimming pool including waste water & pool fencing
- Fires and heating$8,000
Free standing solid fuel heater project description: install of a metro xtreme rad fire into the living room including a metro eco flue kit
- Alterations and additions$20k
Install a second bathrm, with a new bath, shower, vanity & wc, into an existing bdrm.. Connect new toilet to the existing sewer & other plumbing fixtures via new gully trap to existing se
- Commercial alterations$990k
Rbw - prop. Add & alt of exist.Dwg. Prop. Extension of living, dining, kitchen area on new suspended concr. Slab, new internal areas including new bath, office & media, with new m
- Alterations and additions$1,000
Alt.1 installation of in-built wood burning fire/stove. From original bc application, it has been found that the original corner fireplace chimney is off Centre & rather than remove brick
- Alterations and additions$30k
An unconsented beam has been installed previously; we want to install a new one in the ceiling space
- New homes$240k
Pim - standalone single dwg. Construction of a new small contained unit
- Relocated buildings$50k
Foundation & drainage only. Relocated dwg to property & install drainage
- Fires and heating$7,000
Free standing solid fuel heater project description: install of a metro wee rad fire into the living room, including a metro eco flue kit. New soaker & dektite flashing
- New homes$350k
New res dwg
- Alterations and additions$65k
Interior...Bathrm/laundry alt
- Fires and heating$8,000
Free standing solid fuel heater.Installation of masport r1200 freestanding fire, flue kit & flashing
- Alterations and additions$45k
Demolish existing garages entirely & erect new steel framed 12x8m slab on grade shed
- Alterations and additions$18k
Modify bathrm
- Alterations and additions$50k
Pim only - retrofit of existing house including new kitchen, bathrm, windows & insulation
- Garages, sheds and carports$35k
Construct a 9m x 6m x 2.4m totalspan gge
- Fires and heating$7,000
Install of a metro smart insert fire, including a new metro smart insert flue kit
ResidentialCommercial The dots are this page of the list.
Near Wanganui East
Questions
How many building consents were issued in Wanganui East?
In the year to September 2026, Stats NZ counted 190 new homes consented in the Whanganui District council area, with $113m of residential and $72.5m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.