Building consents · Stats NZ figures to September 2026
Commercial building consents in Whangārei
Councils consented $144m of non-residential building work in the Whangarei District council area in the year to September 2026, up 97% on the year before. Below: 39 commercial consents we hold in Whangārei, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Whangarei District council area.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Whangarei District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Offices$35m
8 buildings · 8,875 m² new floor area · $3,529/m² new · +228% on the year before
- Shops, restaurants and bars$23.8m
4 buildings · 4,165 m² new floor area · $4,778/m² new · +231% on the year before
- Hotels and motels$19m
1 building · 2,380 m² new floor area · $7,983/m² new · +4122% on the year before
- Warehouses and storage$19m
6 buildings · 12,895 m² new floor area · $1,466/m² new · +59% on the year before
- Education$18.7m
9 buildings · 2,217 m² new floor area · $1,628/m² new · −26% on the year before
- Social, cultural and religious$12.5m
3 buildings · 592 m² new floor area · $5,380/m² new · +1291% on the year before
- Hospitals and health$6.3m
1 building · 1,165 m² new floor area · $3,863/m² new · +974% on the year before
- Factories and industrial$5.6m
4 buildings · 3,253 m² new floor area · $1,460/m² new · −42% on the year before
- Farm buildings$4.6m
31 buildings · 5,859 m² new floor area · $768/m² new · −24% on the year before
Non-residential work since 1991
The value consented each year, in the dollars of the day (not adjusted for inflation).
Commercial consents on record in Whangārei
Individual building consents we hold, each on its property: 39 from 1 Feb 2020 to 1 Apr 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Commercial alterations27
2 in the last 12 months · typically $66k
- New commercial buildings4
typically $895k
- Relocated buildings1
typically $45k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $150kAlterations to existing dwg - new kitchen, dining, lounge, heating appliance, office, ensuite & bathrm, alt laundry, remove bay window & sunroom 34 Golf Harbour Drive, Maunu
- $35kCommercial alterations & additions 11 Timandra Place, Te Kamo
39 consents
- Commercial alterations$150k
Alterations to existing dwg - new kitchen, dining, lounge, heating appliance, office, ensuite & bathrm, alt laundry, remove bay window & sunroom
- Commercial alterations$35k
Commercial alterations & additions
- Commercial alterations$100k
Detached small office building comprising of a timber subfloor with timber framed walls, rafters roof, vertical corrugated colorsteel & shiplap wall cladding with a longrun colorsteel roof. Plus;
- Commercial alterations$300k
Alterations to existing dwg - bedrooms, office, bathrooms, & laundry
- Commercial alterations$57k
New gge with workshop
- Commercial alterations$60k
Rbw - existing laundry converted to office with new wc. New laundry to one side of the existing walk through scullery. Re-pile of the original section of the house. New roof cladding & three new joi
- Commercial alterations$50k
Add to existing dwg - office
- New commercial buildings$1.2m
Rbw - proposed new three bdrm dwg with home office & four car gge with onsite wastewater system, onsite water storage & supply, all structural, & envelope works associated with the dwel
- Commercial alterations$50k
Firewall to create dwg & retail space (change of use)
- Commercial alterations$50k
Add & alterations to existing dwg - office, bdrm & skylight
- Commercial alterations$700k
Additions & alterations to existing dwg - new office, mudroom, gge, master bdrm, ensuite, deck & entry.
- Commercial alterations$43k
Construction of classroom for Rolleston College (Selwyn District) - offsite prefabrication of two building modules only. Excludes foundations, deck & accessible ramp, cladding across module join, access/egress, completion of electrical work
- Commercial alterations$150k
Add & alterations to existing dwg - gge, bathrm & office
- Commercial alterations$280k
Alterations to existing dwg - office, bdrm & bathrooms
- Commercial alterations$290k
Alterations to existing dwg - stairs, living room, entry, bathrm, kitchen, bedrooms, office, storage & new carport
- Commercial alterations$150k
Additions & alterations to existing dwg - kitchen, deck, bathrooms, bedrooms & office
- Commercial alterations$20k
Alterations to existing dwg - kitchen & office
- Commercial alterations$5,000
Install shacklock orion 601 coal range in gge/workshop
- New commercial buildings$1.3m
To construct a new 2 storey, 3 bdrm dwg with office & attached dbl gge
- Commercial alterations$5,000
New dwg amendment 1: - living room fireplace removed with new window w.06 - sky light in the kitchen has been removed - internal room & office added to back of the gge -windows realigned in the pool room * internal walls added * window arange
- Commercial alterations$268k
New gge with laundry, gym & puppy room
- New commercial buildings$590k
New dwg & gge with office
- New commercial buildings$490k
rbw - new 2 storey dwg with 3 bedrooms, media room, office, 2.5 bathrooms, attached dbl gge, on-site effluent disposal system & 2x 25000l water supply rain tanks & solid fuel heater.
- Relocated buildings$45k
Relocation of two new buildings - workshop & shed
- Commercial alterations$40k
Add & alt to existing dwg - bdrm & office
ResidentialCommercial The dots are this page of the list.
Suburbs in Whangārei
Where the consents we hold are, most in the last 12 months first.
- Maunu1 / 5
- Te Kamo1 / 2
- Tutukaka0 / 3
- Ruatangata West0 / 3
- Parahaka0 / 3
- Abbey Caves0 / 2
- Matapouri0 / 2
- Maungatapere0 / 2
- Ngunguru0 / 2
- Onerahi0 / 2
- One Tree Point0 / 2
- Whau Valley0 / 1
- Otaika0 / 1
- Kensington0 / 1
- Portland0 / 1
- Regent0 / 1
- Riverside0 / 1
- Horahora0 / 1
- Tamaterau0 / 1
- Kokopu0 / 1
- Glenbervie0 / 1
- Avenues0 / 1
Questions
How many building consents were issued in Whangārei?
In the year to September 2026, Stats NZ counted 450 new homes consented in the Whangarei District council area, with $283m of residential and $144m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.