Building consents · Stats NZ figures to September 2026
Building consents in Blue Spur
56 new homes were consented in the Westland District council area in the year to September 2026, up 8% on the year before. They also consented $4.9m of non-residential building work, down 16% on the year before. In the statistical area around Blue Spur, 6 new homes were consented in the same year. Below: 28 consents we hold in Blue Spur, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Westland District council area, and new homes down to statistical areas, which is how Blue Spur’s own count is made.
New homes consented each month
Dwellings in new building consents, Westland District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 80 in 2004.
New homes in Blue Spur
Stats NZ’s new dwellings for the statistical area Blue Spur sits in (Hokitika Rural) — the suburb is smaller than one. In the year to September 2026: 6 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Westland District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Shops, restaurants and bars$2m
+408% on the year before
- Social, cultural and religious$1.2m
1 building · 240 m² new floor area · $833/m² new · +449% on the year before
- Farm buildings$938k
9 buildings · 1,676 m² new floor area · $542/m² new · +42% on the year before
- Factories and industrial$610k
+20% on the year before
- Education$155k
−67% on the year before
Consents on record in Blue Spur
Individual building consents we hold, each on its property: 28 from 1 Oct 2020 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- New homes12
2 in the last 12 months · typically $400k
- Fires and heating7
2 in the last 12 months · typically $7,000
- Garages, sheds and carports2
1 in the last 12 months · typically $25k
- Plumbing, drainage and wastewater1
1 in the last 12 months · typically $40k
- Relocated buildings1
1 in the last 12 months · typically $35k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $443k3 bdrm domestic dwg 100 Brickfield Road
- $400k2 bdrm domestic dwg 2 bay pole shed 67E Blue Spur Road
- $40kSiting, foundation & drainage for transportable dwg with a covered deck & steps 67D Blue Spur Road
- $35kTo relocate an existing one-bdrm dwg with driven piles, internal wall bracing, solar hot water, on-site wastewater & woodsman kanaku woodburner 2 Big Paddock Road
- $8,000Install replacement woodsman strongman multifuel fire to a domestic dwg 180 Hau Hau Road
28 consents
- Plumbing, drainage and wastewater$40k
Siting, foundation & drainage for transportable dwg with a covered deck & steps
- Relocated buildings$35k
To relocate an existing one-bdrm dwg with driven piles, internal wall bracing, solar hot water, on-site wastewater & woodsman kanaku woodburner
- Fires and heating$7,000
Installation of a masport Akaroa mkii wood stacker fire & spiroloc flue.
- Garages, sheds and carports$1
4 bdrm 4 bathrm dwg with attached gge. Amendment 1: alternative solution to stopends on head flashings (head flashings terminate on the outside face of the wall claddings on cavity instead of the inside face of the wall cladding).
- New homes$443k
3 bdrm domestic dwg
- New homes$400k
2 bdrm domestic dwg 2 bay pole shed
- Fires and heating$8,000
Install replacement woodsman strongman multifuel fire to a domestic dwg
- New homes$430k
Single storey 3 bdrm dwg with onsite wastewater & stormwater disposal. Wagener leon multi fuel fire.
- New homes$400k
New, single level, three bdrm, two bathrm dwg with Tarras MKIII woodburner & on-site waste water.
- Fires and heating$8,000
Install woodsman strongman into il1 outbuilding
- New homes$520k
3 bdrm 2 bathrm house with an attached larger single gge
- New homes$480k
New dwg with attached gge, 2-bedrooms, study with woodsman kanuka log fire. Onsite wastewater.
- Fires and heating$7,000
Install new metro micro rad wood burner
- New homes$170k
New 1-bed single-storey dwg with on-site wastewater & nectre bakers oven multi-fuel burner.
- Fires and heating$4,500
New woodsman rmf solid fuel heater
- Fires and heating$7,500
Install yunca blenz space heater
- Fires and heating$7,000
Installation of ravelli dual 7 pellet fire
- New homes$300k
Two bdrm home with space heater & onsite wastewater system.
- New homes$49k
Construct a one bdrm, one bathrm minor dwg with plywood cladding & corrugated iron roofing on timber piles.
- New homes$442k
Construction of a 3 bdrm house with attached gge
- New homes$274k
Construction of single storey dwg. 3 bdrm. 1 bathrm
- Garages, sheds and carports$50k
Construct detached 6 x 9 gge with carport
- New homes$150k
New 2 bdrm pole-barn house with attached shed space.
- Alterations and additions$65k
Extension to existing dwg.
- Alterations and additions$7,500
Replacing the existing 25 year old potterton diesel furnace with a new sime solo 25 diesel furnace, & relocating it from the existing boiler room into the large three car gge. All other aspects of the heating system remain unaffected
ResidentialCommercial The dots are this page of the list.
Near Blue Spur
Questions
How many building consents were issued in Blue Spur?
In the year to September 2026, Stats NZ counted 56 new homes consented in the Westland District council area, with $26m of residential and $4.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.