Building consents · Stats NZ figures to September 2026
Building consents in Lake Kaniere
56 new homes were consented in the Westland District council area in the year to September 2026, up 8% on the year before. They also consented $4.9m of non-residential building work, down 16% on the year before. In the statistical area around Lake Kaniere, 1 new homes were consented in the same year. Below: 11 consents we hold in Lake Kaniere, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Westland District council area, and new homes down to statistical areas, which is how Lake Kaniere’s own count is made.
New homes consented each month
Dwellings in new building consents, Westland District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 80 in 2004.
New homes in Lake Kaniere
Stats NZ’s new dwellings for the statistical area Lake Kaniere sits in (Hokitika Valley-Otira) — the suburb is smaller than one. In the year to September 2026: 1 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Westland District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Shops, restaurants and bars$2m
+408% on the year before
- Social, cultural and religious$1.2m
1 building · 240 m² new floor area · $833/m² new · +449% on the year before
- Farm buildings$938k
9 buildings · 1,676 m² new floor area · $542/m² new · +42% on the year before
- Factories and industrial$610k
+20% on the year before
- Education$155k
−67% on the year before
Consents on record in Lake Kaniere
Individual building consents we hold, each on its property: 11 from 1 Aug 2023 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions4
2 in the last 12 months · typically $21k
- Fires and heating3
1 in the last 12 months · typically $5,000
- New homes2
typically $1.1m
- Decks, pergolas and verandahs1
typically $1
- Relocated buildings1
typically $35k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $35kConstruction of a single-storey extension, including installation of a masport utopia freestanding wood burner 207 Hans Bay Road
- $6,000To install a wagener sparky ca log burner. 211C Hans Bay Road
- $6,000New heating appliance 7 Punga Grove
11 consents
- Fires and heating$6,000
To install a wagener sparky ca log burner.
- Alterations and additions$6,000
New heating appliance
- Alterations and additions$35k
Construction of a single-storey extension, including installation of a masport utopia freestanding wood burner
- Fires and heating$5,000
Installation of yunca blenz freestanding multifuel wetback burner
- New homes$1m
New split level 4 bdrm 2 bathrm dwg with escea dx1000 gas fire & detached triple gge & on-site effluent disposal & concrete block retaining walls
- Alterations and additions$100k
New 9.0m x 14.4m gable non-habitable outbuilding il1
- Alterations and additions$6,000
Res additions & alterations alterations to existing building including new kitchen layout, new entry location & removal of internal load bearing walls.
- Decks, pergolas and verandahs$1
New 4 bdrm dwg amendment 1: amend first floor deck to provide for a waterproof tile floor system. Amend balustrade designed system new 4 bdrm dwg
- New homes$1.2m
3 bdrm, 2 bathrm dwg with attached dbl gge.
- Fires and heating$5,000
Replacing an inbuilt coal burner with a freestanding woodsman heater
- Relocated buildings$35k
Relocated dwg & gge - foundation & site works only
ResidentialCommercial The dots are this page of the list.
Near Lake Kaniere
Questions
How many building consents were issued in Lake Kaniere?
In the year to September 2026, Stats NZ counted 56 new homes consented in the Westland District council area, with $26m of residential and $4.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.