Building consents · Stats NZ figures to September 2026
Building consents in Koru
325 new homes were consented in the New Plymouth District council area in the year to September 2026, down 5% on the year before. They also consented $87.3m of non-residential building work, up 72% on the year before. In the statistical area around Koru, 10 new homes were consented in the same year. Below: 20 consents we hold in Koru, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the New Plymouth District council area, and new homes down to statistical areas, which is how Koru’s own count is made.
New homes consented each month
Dwellings in new building consents, New Plymouth District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 708 in 2021.
New homes in Koru
Stats NZ’s new dwellings for the statistical area Koru sits in (Mangorei) — the suburb is smaller than one. In the year to September 2026: 9 houses, 1 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — New Plymouth District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Social, cultural and religious$29.1m
3 buildings · 9,368 m² new floor area · $2,829/m² new · +112% on the year before
- Education$12.3m
1 building · 1,337 m² new floor area · $3,740/m² new · +152% on the year before
- Warehouses and storage$12.2m
6 buildings · 12,575 m² new floor area · $974/m² new · +880% on the year before
- Hospitals and health$8.5m
1 building · +34471% on the year before
- Factories and industrial$8.3m
7 buildings · 5,131 m² new floor area · $1,473/m² new · +84% on the year before
- Shops, restaurants and bars$6.5m
2 buildings · 294 m² new floor area · $4,932/m² new · −41% on the year before
- Offices$6.5m
3 buildings · 1,833 m² new floor area · $2,428/m² new · −35% on the year before
- Farm buildings$3.9m
29 buildings · 14,657 m² new floor area · $253/m² new · −22% on the year before
- Hotels and motels$31k
−89% on the year before
Consents on record in Koru
Individual building consents we hold, each on its property: 20 from 1 May 2005 to 1 Mar 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
typically $5,000
- Garages, sheds and carports2
1 in the last 12 months · typically $13k
- New homes1
1 in the last 12 months · typically $1.1m
- Pools and spas1
typically $95k
- Repairs, recladding and strengthening1
typically $45k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $1.1mFour bdrm dwg with attached gge 736 Plymouth Road
- $5,000Res/farm - add a wc & sink to an existing shed. 1081 Plymouth Road
20 consents
- New homes$1.1m
Four bdrm dwg with attached gge
- Garages, sheds and carports$5,000
Res/farm - add a wc & sink to an existing shed.
- Alterations and additions$160k
Res/farm - bdrm & living add & internal alterations.
- Garages, sheds and carports$21k
Res/farm-one storey kit set gge.
- Alterations and additions$5,000
Freestanding - free standing metrofire wee rad
- Pools and spas$95k
Res/farm-installation of a narellan grandeur 11 swimming pool
- Repairs, recladding and strengthening$45k
Re-clad- re-clad existing dwg. (p)
- Alterations and additions$1,200
Freestanding - pyro classic
- Garages, sheds and carports$65k
Res/farm - covert part of gge to two bedrooms, one with ensuite (p)
- Garages, sheds and carports$120k
Res/farm - add of gge, bdrm & bathrm (p)
- New homes$302k
Res/farm - two bdrm dwg with attached dbl gge (sol)
- Minor dwellings and sleepouts$15k
Internal dwg alterations - add of shower, vanity, toilet & sink to existing cabin
- Garages, sheds and carports$82k
Garages- gge
- Fires and heating$1,000
Free standing - pyroclassic iv wood fire installation
- Fires and heating$1,700
Log fire - jayline ss200
- Garages, sheds and carports$15k
Res/farm - carport
- Alterations and additions$240k
Res/farm - add of bathrm, three bedrooms & rumpus room to existing dwg
- Fires and heating$5,500
Log fire - metro Ltd wee rad freestanding woodfire
- New homes$285k
Other res/farm - four bdrm single storey dwg with attached dbl gge
- Fires and heating$2,875
Freestanding - install metro wee rad leg freestanding wood burner.
ResidentialCommercial The dots are this page of the list.
Near Koru
Questions
How many building consents were issued in Koru?
In the year to September 2026, Stats NZ counted 325 new homes consented in the New Plymouth District council area, with $194m of residential and $87.3m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.