Building consents · Stats NZ figures to September 2026
Building consents in Cloverlea
417 new homes were consented in the Palmerston North City council area in the year to September 2026, up 4% on the year before. They also consented $188m of non-residential building work, up 8% on the year before. In Cloverlea itself, 7 new homes were consented in the same year. Below: 70 consents we hold in Cloverlea, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Palmerston North City council area, and new homes down to statistical areas, which is how Cloverlea’s own count is made.
New homes consented each month
Dwellings in new building consents, Palmerston North City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 557 in 2021.
New homes in Cloverlea
Stats NZ’s new dwellings for the statistical area that make up most of it: Cloverlea (Palmerston North City). In the year to September 2026: 4 houses, 3 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Palmerston North City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$64.2m
5 buildings · 7,143 m² new floor area · $7,505/m² new · +1060% on the year before
- Warehouses and storage$52.7m
11 buildings · 22,704 m² new floor area · $1,847/m² new · −36% on the year before
- Offices$22.5m
5 buildings · 3,808 m² new floor area · $5,329/m² new · −39% on the year before
- Factories and industrial$17.9m
8 buildings · 3,701 m² new floor area · $3,791/m² new · +275% on the year before
- Shops, restaurants and bars$15.1m
3 buildings · 612 m² new floor area · $9,150/m² new · −20% on the year before
- Education$5.2m
3 buildings · 784 m² new floor area · $4,809/m² new · −29% on the year before
- Social, cultural and religious$5.2m
3 buildings · 1,312 m² new floor area · $2,607/m² new · +255% on the year before
- Hotels and motels$3m
2 buildings · −80% on the year before
- Farm buildings$2.6m
11 buildings · 5,139 m² new floor area · $500/m² new · +27% on the year before
- Hostels, boarding houses and prisons$85k
+42% on the year before
Consents on record in Cloverlea
Individual building consents we hold, each on its property: 70 from 1 Aug 2019 to 1 Jul 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions15
3 in the last 12 months · typically $42k
- Fires and heating13
1 in the last 12 months · typically $7,500
- New homes10
5 in the last 12 months · typically $406k
- Garages, sheds and carports5
typically $37k
- Minor dwellings and sleepouts4
2 in the last 12 months · typically $108k
- Commercial alterations2
typically $28k
- Decks, pergolas and verandahs1
1 in the last 12 months · typically $75k
- Relocated buildings1
typically $30k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $980kRbw - to construct 11 x single level modules to be transported to their permanent site on Waiheke Island. The modules include 4 bedrooms, 3 bathrooms, gym, study, rumpus room, laundry & mudroom. 42 Peters Avenue
- $480kRbw-to construct 4 x single level modules to be transported to their permanent site in Greytown. The modules include kitchen, living, bathrooms, laundry, bedrooms 42 Peters Avenue
- $412k3 bdrm dwg 6 Bendigo Street
- $400kRbw - to construct 4 single level modules to be transported to their permanent site on Waiheke Island. The modules will have kitchen, living, fireplace, 3 by bedrooms, 2 by bathrooms, study. Onsite wo 42 Peters Avenue
- $350k101m2 3 bdrm, 1 bathrm home 15C Tararua Terrace
70 consents
- Fires and heating$8,000
Install metro wee rad woody freestanding wood fire into living room
- Minor dwellings and sleepouts$200k
Rbw - staged 1 of 2 bc - off-site construction of sleepout that includes bdrm, dressing room & ensuite in two sections. Part 2 to include site info, hwc, foundation & roof cladding.
- New homes$350k
101m2 3 bdrm, 1 bathrm home
- Alterations and additions$42k
The removal of shub & vanity, flooring to accommodate level entry shower
- Minor dwellings and sleepouts$10k
Alterations to existing sleepout including new bathrm.
- Alterations and additions$50k
Reframe existing wall oblique linea cladding new door & window units
- New homes$400k
Rbw - to construct 4 single level modules to be transported to their permanent site on Waiheke Island. The modules will have kitchen, living, fireplace, 3 by bedrooms, 2 by bathrooms, study. Onsite wo
- New homes$412k
3 bdrm dwg
- New homes$980k
Rbw - to construct 11 x single level modules to be transported to their permanent site on Waiheke Island. The modules include 4 bedrooms, 3 bathrooms, gym, study, rumpus room, laundry & mudroom.
- Decks, pergolas and verandahs$75k
Reclad & re roof the home, 3 windows replaced, new stratco verandah.
- New homes$480k
Rbw-to construct 4 x single level modules to be transported to their permanent site in Greytown. The modules include kitchen, living, bathrooms, laundry, bedrooms
- Alterations and additions$40k
Existing dwg new alt & extension.
- Commercial alterations$20k
Home extension encompassing attached, external office only
- Alterations and additions$25k
Change to bathrm layout including a waterproofed shower & new lintels
- Alterations and additions$40k
Existing dwg internal alterations to the kitchen & dining areas
- Garages, sheds and carports$50k
Construct a 9 x 6m versatile gge.
- Fires and heating$8,200
Install a masport Kaituna pedestal fire, flue system & flashing
- New homes$422k
Three bdrm, one bathrm, open plan living with integral single gge
- Fires and heating$8,300
Install a metro wee rad base freestanding wood fire into lounge.
- Fires and heating$3,000
Install masport wood burning fire r1200pedpack
- Fires and heating$7,500
Install a metro wee rad leg into the lounge room.
- Alterations and additions$45k
Alt to units - fire performance upgrade to minimise fire spread between units
- New homes$350k
Rbw - single level dwg- to construct 3 single level modules to be transported to their permanent site in 54 Panorama Parade Pauanui. The modules will have kitchen, living, fireplace, 2 x bedrooms
- Minor dwellings and sleepouts$200k
Rbw- to construct 1 single level dwg transported to the permanent site in Clevedon. The dwg will have 1 kitchenette, bathrm, open plan studio with sleeping, internal fireplace room.Superst
- Fires and heating$7,800
Installation of masport le4000 insert fire & flue system
ResidentialCommercial The dots are this page of the list.
Near Cloverlea
Questions
How many building consents were issued in Cloverlea?
In the year to September 2026, Stats NZ counted 417 new homes consented in the Palmerston North City council area, with $215m of residential and $188m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.