Building consents · Stats NZ figures to September 2026
Building consents in West End
417 new homes were consented in the Palmerston North City council area in the year to September 2026, up 4% on the year before. They also consented $188m of non-residential building work, up 8% on the year before. In West End itself, 13 new homes were consented in the same year. Below: 130 consents we hold in West End, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Palmerston North City council area, and new homes down to statistical areas, which is how West End’s own count is made.
New homes consented each month
Dwellings in new building consents, Palmerston North City, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 557 in 2021.
New homes in West End
Stats NZ’s new dwellings for the 2 statistical areas that make up most of it: West End, Esplanade. In the year to September 2026: 6 houses, 7 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Palmerston North City, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hospitals and health$64.2m
5 buildings · 7,143 m² new floor area · $7,505/m² new · +1060% on the year before
- Warehouses and storage$52.7m
11 buildings · 22,704 m² new floor area · $1,847/m² new · −36% on the year before
- Offices$22.5m
5 buildings · 3,808 m² new floor area · $5,329/m² new · −39% on the year before
- Factories and industrial$17.9m
8 buildings · 3,701 m² new floor area · $3,791/m² new · +275% on the year before
- Shops, restaurants and bars$15.1m
3 buildings · 612 m² new floor area · $9,150/m² new · −20% on the year before
- Education$5.2m
3 buildings · 784 m² new floor area · $4,809/m² new · −29% on the year before
- Social, cultural and religious$5.2m
3 buildings · 1,312 m² new floor area · $2,607/m² new · +255% on the year before
- Hotels and motels$3m
2 buildings · −80% on the year before
- Farm buildings$2.6m
11 buildings · 5,139 m² new floor area · $500/m² new · +27% on the year before
- Hostels, boarding houses and prisons$85k
+42% on the year before
Consents on record in West End
Individual building consents we hold, each on its property: 130 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions23
2 in the last 12 months · typically $35k
- New homes13
4 in the last 12 months · typically $399k
- Fires and heating13
typically $6,700
- Plumbing, drainage and wastewater5
typically $11k
- Garages, sheds and carports5
typically $50k
- Repairs, recladding and strengthening2
typically $115k
- Pools and spas1
1 in the last 12 months · typically $100k
- Multiple homes1
typically $2.4m
- Minor dwellings and sleepouts1
typically $15k
- Other new buildings1
typically $400k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $2.4mTo construct a new 3 bdrm home & gge/workshop in the place of an existing demolished dwg 22A Moerangi Street
- $409kNew 3 bdrm dwg with attached gge. 1C Hendon Place
- $399kTo construct a new single level 3 bdrm dwg with internal acces 310A College Street
- $180kConstruction of 3 bdrm home with open living 4A Viscount Place
- $100kInstall of new inground swimming pool 281A Fitzherbert Avenue
130 consents
- Alterations and additions$20k
Internal alterations to remove existing load bearing & braced wall
- New homes$180k
Construction of 3 bdrm home with open living
- New homes$2.4m
To construct a new 3 bdrm home & gge/workshop in the place of an existing demolished dwg
- Pools and spas$100k
Install of new inground swimming pool
- New homes$399k
To construct a new single level 3 bdrm dwg with internal acces
- New homes$409k
New 3 bdrm dwg with attached gge.
- Alterations and additions$5,000
Internal alt to remove a load-bearing wall between kitchen & dining room
- New homes$480k
Construction of 3 bdrm dwg with open plan living & single car gge
- Fires and heating$5,000
Install jayline fr300 wood stacker f/stdg logfire
- Fires and heating$5,000
Install freestanding metro fire r1 with metro eco flue.
- Alterations and additions$100k
Rebuild existing lounge removing existing foundation, walls & roof to replace with new structure
- Alterations and additions$25k
Renovation to existing bathrm. Including level entry tiled shower
- Fires and heating$8,100
Replacement fire, install a masport Kaituna pedestal fire, flue system
- Plumbing, drainage and wastewater$11k
Installation of a new toilet .
- Plumbing, drainage and wastewater$32k
Replacement of existing septic tank with new ecocycle fusion waste water system & effluent field., minor variation moving the back wall of the gge to align with the existing back wall of the house. Moving laundry tup changing the sliding door to
- New homes$380k
Construction of a new 3 bdrm townhouse with single attached gge
- Alterations and additions$5,000
Amendment - change from acrylic showers to tiled showers
- Plumbing, drainage and wastewater$10k
Installing new stormwater drains
- Repairs, recladding and strengthening$150k
Repairs to existing fire damaged dwg
- Alterations and additions$40k
New accessory building
- Fires and heating$5,000
Install masport Rakaia freestanding woodburner
- Fires and heating$7,900
Install a maxen Forbury 550 insert fire, flue system & flashing
- Alterations and additions$35k
Removal of internal load-bearing wall
- Alterations and additions$120k
Alterations to existing dwg. Alterations to include removal of existing load-bearing walls to suit reconfiguration of ground floor
- New homes$700k
Construction of a 3 bdrm, 2 bathrm dwg with Metro Rad
ResidentialCommercial The dots are this page of the list.
Near West End
Questions
How many building consents were issued in West End?
In the year to September 2026, Stats NZ counted 417 new homes consented in the Palmerston North City council area, with $215m of residential and $188m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.