Building consents · Stats NZ figures to September 2026
Building consents in Hannahs Bay
457 new homes were consented in the Rotorua District council area in the year to September 2026, up 1% on the year before. They also consented $66.9m of non-residential building work, up 43% on the year before. In the statistical area around Hannahs Bay, 14 new homes were consented in the same year. Below: 29 consents we hold in Hannahs Bay, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Rotorua District council area, and new homes down to statistical areas, which is how Hannahs Bay’s own count is made.
New homes consented each month
Dwellings in new building consents, Rotorua District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 678 in 2024.
New homes in Hannahs Bay
Stats NZ’s new dwellings for the statistical area Hannahs Bay sits in (Holdens Bay-Rotokawa) — the suburb is smaller than one. In the year to September 2026: 14 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Rotorua District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hotels and motels$27.7m
1 building · 253 m² new floor area · $2,372/m² new · +278% on the year before
- Factories and industrial$10.1m
4 buildings · 3,656 m² new floor area · $1,550/m² new · +54% on the year before
- Education$7.2m
5 buildings · 951 m² new floor area · $4,601/m² new · −30% on the year before
- Hospitals and health$6.5m
1 building · 51 m² new floor area · $3,412/m² new · +1323% on the year before
- Social, cultural and religious$6.2m
5 buildings · 232 m² new floor area · $4,483/m² new · +181% on the year before
- Farm buildings$3.9m
23 buildings · 7,548 m² new floor area · $477/m² new · +11% on the year before
- Shops, restaurants and bars$3.5m
−40% on the year before
- Offices$1.8m
1 building · 143 m² new floor area · $5,245/m² new · +34% on the year before
- Warehouses and storage$93k
1 building · 30 m² new floor area · $1,567/m² new · −99% on the year before
Consents on record in Hannahs Bay
Individual building consents we hold, each on its property: 29 from 1 Aug 2019 to 1 Jun 2026. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Alterations and additions3
1 in the last 12 months · typically $25k
- Fires and heating2
typically $5,000
- Decks, pergolas and verandahs1
typically $150k
- New homes1
typically $567k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $30kBathrm alterations & new external joinery 4 Willow Avenue
29 consents
- Alterations and additions$30k
Bathrm alterations & new external joinery
- Fires and heating$5,000
Alt to dwg - installation of Woodsman Coleridge (Leg), freestanding, dry, wood burner CAC 211473
- Fires and heating$5,000
Install masport Rangitata insert fire
- New homes$567k
New dwg
- Alterations and additions$25k
Bathrm alterations & internal wall changes
- Decks, pergolas and verandahs$150k
Internal layout change, new roofing & wall cladding, verandah add
- Alterations and additions$20k
Bathrm alterations
- Fires and heating$6,000
Metro wee rad ultra f/s woodburner
- Minor dwellings and sleepouts$20k
Convert sleep out to subsidiary dwg
- Plumbing, drainage and wastewater$3,000
Connect transportable building to existing sewer
- Fires and heating$4,000
Masport r3000 f/s woodburner
- Fires and heating$4,500
Masport r3000 ped f/s woodburner
- Fires and heating$6,000
Disconnect wetback & install woodsman serene f/s woodburner
- Alterations and additions$45k
Add + alt
- Alterations and additions$30k
Bathrm alt
- New homes$550k
New dwg
- Fires and heating$6,000
Remove old wood burner & install a new woodsman serene f/s woodburner
- Alterations and additions$50k
Bathrm alt
- Fires and heating$5,000
Install masport hestia 2 f/s woodburner
- Fires and heating$4,950
Install woodsman Tasman f/s woodburner
- Fires and heating$3,000
Masport r3000 ped f/s woodburner
- Fires and heating$5,000
Replace with woodsman serene woodburner
- Fires and heating$5,000
Replace with woodsman Tasman mkii f/s woodburner
- Fires and heating$3,000
F/s masport r3000 wood stacker woodburner
- Fires and heating$4,000
Masport r5000 f/s woodburner
ResidentialCommercial The dots are this page of the list.
Near Hannahs Bay
Questions
How many building consents were issued in Hannahs Bay?
In the year to September 2026, Stats NZ counted 457 new homes consented in the Rotorua District council area, with $193m of residential and $66.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.