Building consents · Stats NZ figures to September 2026
Building consents in Holdens Bay
457 new homes were consented in the Rotorua District council area in the year to September 2026, up 1% on the year before. They also consented $66.9m of non-residential building work, up 43% on the year before. In the statistical area around Holdens Bay, 14 new homes were consented in the same year. Below: 26 consents we hold in Holdens Bay, searchable and on the map.
Stats NZ publishes building consents down to the council, so the official figures on this page are for the Rotorua District council area, and new homes down to statistical areas, which is how Holdens Bay’s own count is made.
New homes consented each month
Dwellings in new building consents, Rotorua District, the last five years.
Since 1991: houses and everything else
New homes consented each year, houses against townhouses, flats, units, apartments and retirement village units. The most in one year was 678 in 2024.
New homes in Holdens Bay
Stats NZ’s new dwellings for the statistical area Holdens Bay sits in (Holdens Bay-Rotokawa) — the suburb is smaller than one. In the year to September 2026: 14 houses, 0 townhouses and units, 0 apartments.
Non-residential building work each month
The value of new and altered non-residential buildings consented — offices, shops, factories, warehouses, farm buildings, schools, hospitals — Rotorua District, the last five years.
What is being built
Non-residential building work consented in the year to September 2026, by type: the value of new and altered work, new floor area, and what new floor area cost to build per square metre.
- Hotels and motels$27.7m
1 building · 253 m² new floor area · $2,372/m² new · +278% on the year before
- Factories and industrial$10.1m
4 buildings · 3,656 m² new floor area · $1,550/m² new · +54% on the year before
- Education$7.2m
5 buildings · 951 m² new floor area · $4,601/m² new · −30% on the year before
- Hospitals and health$6.5m
1 building · 51 m² new floor area · $3,412/m² new · +1323% on the year before
- Social, cultural and religious$6.2m
5 buildings · 232 m² new floor area · $4,483/m² new · +181% on the year before
- Farm buildings$3.9m
23 buildings · 7,548 m² new floor area · $477/m² new · +11% on the year before
- Shops, restaurants and bars$3.5m
−40% on the year before
- Offices$1.8m
1 building · 143 m² new floor area · $5,245/m² new · +34% on the year before
- Warehouses and storage$93k
1 building · 30 m² new floor area · $1,567/m² new · −99% on the year before
Consents on record in Holdens Bay
Individual building consents we hold, each on its property: 26 from 1 Jul 2019 to 1 Dec 2025. Councils publish their records unevenly, so these are what we have, not every consent issued — for the full count, see the official figures above.
What the work is
Consents in the last five years by the kind of work their description names.
- Relocated buildings3
1 in the last 12 months · typically $60k
- Alterations and additions2
typically $143k
- Fires and heating2
typically $5,750
- Garages, sheds and carports1
typically $15k
- New homes1
typically $650k
Consents on record by month
The last three years. A recent dip is often records still to arrive.
Largest in the last 12 months
- $40kNew relocatable dwg 8A Holden Avenue
26 consents
- Relocated buildings$40k
New relocatable dwg
- New homes$650k
New dwg
- Fires and heating$5,500
Masport r5000 freestanding fire on existing wetback pipes
- Fires and heating$6,000
Install masport Hurunui ped freestanding fire
- Relocated buildings$100k
New relocated dwg & detached gge
- Alterations and additions$206k
Add & internal alterations
- Alterations and additions$80k
Change of use from rumpus storage space to a secondary dwg in the upper space only
- Garages, sheds and carports$15k
New gge
- Relocated buildings$60k
Relocate dwg on wheels & connect to services
- Relocated buildings$9,000
Relocated dwg
- Alterations and additions$18k
Convert storage to subsidiary dwg
- Fires and heating$4,500
Replaced with metro ambi plus f/s woodburner
- Fires and heating$4,500
Replaced with metro ambri plus f/s woodburner
- Fires and heating$6,000
Replaced with woodsman serene f/s woodburner
- Fires and heating$6,000
Install masport hestia 2 f/s wood burner
- Fires and heating$6,000
Install woodsman serene
- Fires and heating$6,000
Install metro classic rad f/s woodburner to existing wetback
- Fires and heating$4,000
Masport i2000 Bannockburn f/s woodburner
- Fires and heating$6,000
Replace with woodsman serene f/s woodburner
- Fires and heating$3,000
Install masport i2000 Bannockburn inbuilt woodburner
- Demolition$50k
Demolish part & rebuild
- Fires and heating$3,500
Replace with masport r3000 ped f/s woodburner
- Alterations and additions$85k
Two bdrm add
- Garages, sheds and carports$36k
New gge
- Fires and heating$5,000
Masport r5000 ped f/s woodburner on existing wetback
ResidentialCommercial The dots are this page of the list.
Near Holdens Bay
Questions
How many building consents were issued in Holdens Bay?
In the year to September 2026, Stats NZ counted 457 new homes consented in the Rotorua District council area, with $193m of residential and $66.9m of non-residential building work.
What is a building consent?
Written approval from a council (a building consent authority) that planned building work complies with the Building Code. Most new buildings, additions, structural alterations, fires and plumbing and drainage work need one; some minor work is exempt under Schedule 1 of the Building Act 2004.
Where do these figures come from?
The official counts are Stats NZ’s monthly Building consents issued release (CC BY 4.0), covering every consent every council issues. The individual consents listed are ones we hold from councils’ records and other public sources; they are not a complete list for every council.